My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Measure M2 Funding Eligibility 2026-27 Renewal
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
06/02/2026 Regular
>
Item 18 - Measure M2 Funding Eligibility 2026-27 Renewal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 11:02:55 AM
Creation date
5/27/2026 11:01:31 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
18
Date
6/2/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 4 <br /> B. System Improvements: <br /> In addition to the corridor synchronization, 6. 1st St/Bolsa Ave Corridor: <br /> improvements to the traffic signal system, Improvements include upgrading <br /> communication and monitoring infrastructure controllers to ATC, installing CCTV <br /> were made along the following corridors to allow cameras and VDS, installing APS, <br /> the City to better monitor traffic condition, installing conduit and fiber optic <br /> manage traffic signals and maintain signal cable, installing Ethernet switches, <br /> synchronization. replacing traffic signal cabinets, and <br /> Signal Performance Measures. <br /> 1. Tustin Ave/Rose Dr Corridor: <br /> Improvements include upgrading 7. Kraemer-Glassell-Grand Corridor: <br /> controllers to ATC, installing fiber Improvements include upgrading <br /> optic cable, installing Ethernet controllers to ATC, installing CCTV <br /> switches, installing CCTV cameras, cameras and VDS, installing APS, <br /> and upgrading traffic signal cabinets. installing fiber optic cable, installing <br /> Ethernet switches, installing wireless <br /> 2. Edinger Ave Corridor: radios, Signal Performance <br /> Improvements include upgrading Measures, and TMC improvements. <br /> controllers to ATC, installing CCTV <br /> cameras and VDS, installing conduit 8• McFadden TSP: <br /> and fiber optic cable, installing Improvements include installing a <br /> Ethernet switches, ATMS License cloud-based Transit Signal Priority <br /> expansion, and Signal Performance (TSP)system with secure controller <br /> Measures. communication and centralized <br /> system management at 19 <br /> 3. Warner Ave Corridor: intersections. <br /> Improvements include upgrading <br /> controllers to ATC, installing CCTV 9. Bristol Street Corridor: <br /> cameras and VDS, installing conduit Improvements include upgrading <br /> and fiber optic cable, installing controllers to ATC, installing CCTV <br /> Ethernet switches, installing and VDS, installing APS, install <br /> Bluetooth travel systems, replacing Ethernet switches, and TMC <br /> traffic signal cabinets, ATMS License improvements including relocating <br /> expansion and Signal Performance and installing equipment into the new <br /> Measures. TMC and implementing a new video <br /> wall. <br /> 4. MacArthur Blvd Corridor: <br /> Improvements include upgrading <br /> controllers to ATC, installing CCTV <br /> cameras and VDS, installing conduit <br /> and fiber optic cable, installing <br /> Ethernet switches, installing <br /> Bluetooth travel systems, replacing <br /> traffic signal cabinets,ATMS License <br /> expansion and Signal Performance <br /> Measures. <br /> 5. Segerstrom/Dyer Corridor: <br /> Improvements include upgrading <br /> controllers to ATC, installing CCTV <br /> cameras and VDS, installing conduit <br /> and fiber optic cable, Ethernet <br /> switches, and Signal Performance <br /> Measures. <br /> SANTA ANA LOCAL SIGNAL SYNCHRONIZATION PLAN I 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.