My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BERNARDS BROS, INC. (2)
Clerk
>
Contracts / Agreements
>
B
>
BERNARDS BROS, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 11:43:01 AM
Creation date
5/27/2026 11:42:41 AM
Metadata
Fields
Template:
Contracts
Company Name
BERNARDS BROS, INC.
Contract #
A-2026-061
Agency
Public Works
Council Approval Date
5/5/2026
Expiration Date
5/4/2028
Insurance Exp Date
7/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Architectwillfacilitate a part-day Integrated Design Workshop (IDW)with various <br /> stakeholders from City departments invited at the request of the City Project <br /> Manager. Sub consultants will attend virtually or in-person,to review AE <br /> deliverables from Schematic Design Phase and do a"page-turn"to review design <br /> intent, confirm directions from City provided ASR01 comments, and confirm <br /> directions for DD development. <br /> Consultants will advance the project to the Design Development level drawings and <br /> specifications. <br /> Deliverables: Design Development drawings and Outline specifications. <br /> B2.2.2 Phase 3 Construction Documents-90% Submission-Permit Submittal <br /> Consultants shall incorporate responses to City comments from the DID submission <br /> and begin preparation of construction documents and details of sufficient detail to <br /> be deemed sufficient for permit review. <br /> Deliverables: Permit Submittal Plans and Specifications. <br /> B2.2.3 Phase 4 Construction Documents-100%Submission-Back check <br /> submittal <br /> Consultants shall incorporate responses to City comments from the Building <br /> Department and prepare a re-submission of sufficient detail to obtain building <br /> permit. <br /> Deliverables: Permit Re-Submittal Plans and Specifications. <br /> B2.2.4 Phase 5 Bidding Support <br /> Consultant shall support Contractor and City in obtaining bids for the work by <br /> providing answers to questions and issuing addendum as needed. <br /> 132.3 Project Meetings and Coordination: <br /> B2.3.1 Project Meetings <br /> Architect shall attend up to 12 Contractor-Architect Coordination meetings. <br /> Architect shall conduct Architect subconsultant meetings as needed. <br /> Architect shall attend and support Owner-Architect-Contractor(OAC) meetings on a <br /> two-three week interval during active design phases up to a total of 12 meetings. <br /> Architect shall conduct up to six additional stakeholder meeting as requested by the <br /> City-that may include City Planning, meetings with County, City Building Off iciat, <br /> SASE PLAZA DEMO ASR 01 B—PART 2 GROUP 4 ARCHITECTURE 2026-02-23 Page 8 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.