Laserfiche WebLink
City of Santa Ana 11/21/2025 4:52 PM <br /> Plaza of the Fountains Demo <br /> Pre-Construction Phase 1 B <br /> Bernards Brothers Inc. <br /> ASR 01 B <br /> ASR 01 B PRECONSTRUCTION SERVICES PLAZA DEMO ONLY-STAGE 2 <br /> DISCIPLINE 1 CONSULTANT PHASE <br /> Architect CE Structural Civil Elee/Plumb SUBTOTAL <br /> PHASE 1 DESCRIPTION Group 4 11 ECORP KPFF [MEG MEP Cal FEES <br /> 131.1-131.5 CEQA Services Categorical Exemption T&M $ 9,720 $19,007 $0 $0 $0 $ 28,727 <br /> B2.1 Phase 2: Design Development Lump Sum $ 65,490 $0 $11,937 $11,866 $29,118 $ 138,411 <br /> B2.2 Phase 3: Construction Does(90%)Lump Sum $ 109,292 $0 $11,937 $34,431 $33,097 $ 188,757 <br /> B2,3 Phase 4; Construction Docs(100%permit)Lump $ 34,405 $0 $9,476 $17,870 $10,853 $ 72,584 <br /> B2.4 Phase 5: Bidding lump Sum $ 17,473 $0 $1,725 $4,395 $5,739 $ 29,332 <br /> ASR 01 B Part 2 Total $ 256,380 $19,007 $36,075 $68,561 $78,787 $ 467,809 <br /> G:\24621-01 Santa Ana State BIdg\Y-Contract\CLIENT-G4-Bernards�Additlonal SeNicesWR-016 Plaza Demo Part 2 wlth CE\DRAFTS\2025-11-17 Draft to BBI\2025-11-17 ASRo113 ASR 01B 2025-11-17 11/21/2025 <br />