My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
OIS2012-003_Scene Report - Bradley_pdf_Redacted
Clerk
>
Police Records
>
SB1421
>
Officer Involved Shooting
>
OIS2012-003|SEPTEMBER 10, 2012 | SAPD 2012-26709
>
DOCUMENTS
>
OIS2012-003_Scene Report - Bradley_pdf_Redacted
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2026 3:24:44 PM
Creation date
6/1/2026 3:24:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
S.A. 12‐022 <br />Investigator: RICHARD BRADLEY Approved By: <br />Date of Report: 10‐05‐12 Date: 10/09/12 <br />Page 3 of 11 <br />The interior perimeter included the parking lot area and vehicle access lanes between <br />the east structure and the east complex cinder block wall. The interior perimeter was <br />bordered on the north by the north wall of the east structure. It was bordered on the south by <br />the south wall of the east structure. It was bordered on the east by the east complex cinder <br />block wall and on the west by the east side of the east structure. <br />The exterior perimeter included the exterior perimeter of the entire business complex. <br />The exterior perimeter was bordered on the west by South Bristol Street, on the north by West <br />Segerstrom Avenue, on the east by the property line cinder block wall, and on the south by the <br />property line cinder block wall. <br />The parking lot and vehicle access lanes to the rear of the east structure were a <br />composition asphalt surface. The vehicle access lanes were wide enough to accommodate <br />vehicle traffic traveling northbound and southbound simultaneously. There was a concrete <br />gutter in the middle of the vehicle access lanes separating the lanes for the two directions of <br />traffic. At the east side of the northbound vehicle access lane were painted parking stalls. The <br />lines of the parking stalls ran east to west. The parking stall lines began at the base of the east <br />complex cinder block wall and culminated at the east edge of the northbound vehicle access <br />lane. <br />South of the north interior perimeter line there were three parking stalls, a raised <br />planter box surrounded by a concrete curb, then five parking stalls to the south interior <br />perimeter line. The raised planter box had a two‐lamp light pole in the center at the east cinder <br />block wall and a small shrub at the southwest side. Both lamps on the light pole were <br />functioning. The raised planter box was slightly wider than a normal parking space. There were
The URL can be used to link to this page
Your browser does not support the video tag.