Laserfiche WebLink
PHA R-1: <br />Project Description <br />Phase - I consists of 74 multi-family residential units designed to provide affordable rental <br />housing for families, with one unit reserved for a full -time, on -site property manager. The <br />development will be constructed on approximately 2.44 acres on the block hounded by a.nta <br />Ana Boulevard, Lacy Street, Sixth Street, and Minter Street. All units in Phase - I will have <br />long term a ordabi 1 ity c oven ants res tricting tenancy to Flu al i f ing hou s eho ld s. <br />In addition to the residential units, the project inclu d os on-site management offices, interior <br />resident community space and ground floor retail on the comer e f Lacy and Sixth Streets. <br />portion of the conununity space may he made available for child care facilities consistent with <br />Section 305,3 of the Agreement. <br />The prof ect i s des i gne d with an i ntenor, at -g rade p arkin g p o d iurn that i s wrapp ed with two -s Cory <br />townhomes along the m aj orit of the street frontage. Additional townhome units are arranged <br />atop the podium around interior courtyard spaces. <br />The project will include 23 3-Bedroom and 51 - Bedroom units. Residential parking will be <br />located within the at -grade podium. Guest and retail parking is provided on site at grade along <br />Sixth Street. All parking is provided on site in ratios that satisfy the requirements of the Transit <br />Zoning Code. <br />e2ura Parcels /Additional Property <br />The Segura Parcels have been included in the Phase -1 Conceptual Site Plan. The only <br />ddit io real Prop erty in P ha so -1 i s id entifie d a s 60 7 E. S i th S tre et. Should the Agency ac quire <br />this parcel within the time frame contemplated by the Agreement, the parking and site <br />landscaping may be reconfigured to integrate such Additional Property into the Site Plan. <br />Overall development program and parking ratios would not be affected b s reconfiguration. <br />signs <br />All signage on the premises shall be designed to meet applicable zoning codes. <br />Landscalp <br />Project landscaping shall be designed to maximize opportunities for on -site storm water <br />detention in areas not utilized for buildings, driveways and parking. Landscape elements may <br />include planters, terraces, trees, decorative walls, screenings, h arhequ a s, benches, and paving <br />elements. Planted areas will be equipped with p ennanent water sprinkler systems. Final <br />1 and se ap a /outdo or amenity pl are will b e subj ect to Agency review and appro a 1. <br />ATTACHMENT NO. -4 <br />