Laserfiche WebLink
PH -2. <br />r ied Description <br />Phase R-2 consists of 38 multi- fannil residential units designed to provide affordable rental <br />lousing for families, with one unit reserved for a full -time, on -site property manager. The unit <br />mix includes 1 - Bedroom and 26 2-Bedroom units. <br />Phase R-2 will be constructed on approximately 1. 88 acres on three scattered s rtes identified on <br />the Site Map as "Lot " `Lot 311 and "Lot 4." All units in Phase R-2 will have long term <br />affordability covenants restricting tenancy to qualifying households. <br />Phase R-2 is designed as at -grade wood frame construction including a mix of two -story attached <br />townhomes and single story flats. Parking is provided in a combination of detached and "tuck <br />under"' garages. All parking is provided on s i to in ratios that satisfy the requirements of the <br />Transit Zoning Code. <br />Additional Pru��rt <br />812 E. Santa Ana is a property adjacent to the "Lot 4" parcel which has been identified a s an <br />Additional Property with respect to Phase, R-2. Should the gen cy acquire this parcel within the <br />timefrarne contemplated by the Agreement, Phase - would be Banded to include up to an <br />ad di tlon al 4 residential u nits in lu ding code required parking) on the "Lot V parcel by <br />expanding the Phase - design concept to the Additional Property. <br />Sigorns <br />All sign age on the premises shall be designed to meet applicable ordn odes . <br />Ira ndap in <br />Project landscaping shall be designed to maximize opportunities for on -site stormwater detention <br />in areas not utilized for buildings, driveways and gaming. Landscape elements may include <br />planters, terraces, trees* decorative walls, screenings, barbequ s, benches, and paving elements. <br />Planted areas will be equipped with permanent grater spirinkler systems to ensure proper <br />maintenance. Final landscape/outdoor amenity plan will be subject to Agency review and <br />approval. <br />ti l i ti /P b lic Improvements <br />Project will include utility conneu tions and hookups to sewers, drains, water and gas distribution <br />lines, electric and telephone lines. The project will include curb, gutter and sidewalk <br />replacement around the periphery of the project site where needed and all necessary dedications <br />and improvements to establish 17}' 17' comer cutoffs and wheelchair ramps at street <br />intersections. Phase R-2 may also include sever, street, and water main improvements as <br />required h project Land Use Approvals. <br />ATTACHMENT ISO. - <br />DO f 14 730412 27 - 1 <br />