Laserfiche WebLink
12 -ORA -55-6.8-6.9 <br />EA: OH290 <br />District Agreement 12-0624 <br />SCOPE SUMMARY <br />a � <br />so <br />i• <br />`o <br />oo Q' <br />o <br />U) <br />zQ <br />oC <br />v <br />c <br />a <br />w i <br />rn <br />5 270 <br />Construction Engineering and General Contract <br />Administration <br />X <br />X <br />10 <br />Construction Staking Package and Control <br />X <br />15 <br />Construction Stakes <br />X <br />20 <br />Construction Engineering Work <br />X <br />25 <br />Construction Contract Administration Work <br />X <br />30 <br />Contract Item Work Inspection <br />X <br />35 <br />Construction Material Sampling and Testing <br />X <br />X <br />05 <br />Materials Sampling and Testing for Quality Assurance <br />X <br />10 <br />Plant Inspection for Quality Assurance <br />X <br />15 <br />Independent Assurance Sampling and Testing <br />I X <br />20 <br />Source Inspection <br />X <br />40 <br />Safety and Maintenance Reviews <br />X <br />45 <br />Relief From Maintenance Process <br />X <br />55 <br />Final Inspection and Acceptance Recommendation <br />X <br />60 <br />Plant Establishment Administration <br />X <br />65 <br />Transportation Management Plan Implementation During <br />Construction <br />X <br />75 <br />Resource Agency Permit Renewal and Extension <br />Requests <br />X <br />80 <br />Long -Term Environmental Mitigation/Mitigation <br />Monitoring During Construction Contract <br />X <br />99 <br />Other Construction Engineering and General Contract <br />Administration <br />X <br />5 285 <br />Contract Change Order Administration <br />X <br />5 290 <br />Resolve Contract Claims <br />X <br />5 295 <br />Accept Contract, Prepare Final Construction Estimate, <br />and Final Report <br />X <br />PACT Version 9.1 3.31.08 <br />23B-21 <br />16 of 17 <br />