My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2010-11-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
11/15/2010
>
FULL PACKET_2010-11-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2018 5:00:45 PM
Creation date
11/10/2010 3:43:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
11/15/2010
Destruction Year
2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
514
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Obtain peak hour turning movement traffic count data at the intersection of Grand <br />Avenue and McFadden Avenue for three peak periods: <br />AM peak hour (7:00 to 9:00 AM) <br />Lunchtime peak hour (11:00 AM to 1:00 PM) <br />PM peak hour (4:00 to 6:00 PM) <br />• Obtain daily traffic volumes on the roadway segments in the immediate vicinity of the <br />project site: <br />- Grand Avenue, north and south of McFadden Avenue <br />- McFadden Avenue, east and west of Grand Avenue <br />• Develop project trip generation estimates for the proposed project the morning, midday <br />(lunchtime), and evening peals hours. <br />The trip generation data that is available in the Institute of Transportation Engineers (ITE) <br />Trip Generation (8th Edition) publication for a fast -food restaurant with a drive - through <br />contains widely varying results for daily and peak hour periods, and the Rz values are very <br />low. The Trip Generation document also does not provide trip generation data for the <br />lunchtime peak period. <br />For these reasons, we propose to develop trip generation rates by other means: <br />- Kimley -Horn will first poll our Kimley -Horn offices across the country to see if any of <br />our colleagues have conducted trip generation studies for McDonald's. <br />- We will then conduct an internet search to see if trip generation data for McDonald's <br />is available from other sources. <br />We will submit any data obtained through these efforts to City staff for review and <br />consideration. <br />If, after review of the data, it is determined that trip generation data needs to be <br />collected locally, we will arrange for driveway counts at two local McDonald's for the <br />time periods listed above. We will request input from the project applicant and city <br />staff to identify two appropriate McDonald's locations for data collection. For <br />budgeting purposes, the cost for traffic data collection is assumed in this proposal. <br />• The El Cortez restaurant and banquet facility is currently operating on a limited schedule. <br />They are not open Monday through Wednesday, are open for lunch and dinner on <br />Thursday, and open only for dinner Friday through Sunday. We will consult with staff to <br />develop an appropriate approach to account for trip generation for the existing site <br />operation. <br />• Develop trip distribution assumptions for the project traffic, based on likely origins and <br />destinations of employees and customers, and current traffic patterns in the area. Project <br />traffic will be distributed through the study intersection and on area roadway segments, <br />and the project traffic contribution to each intersection will be identified. <br />City of Santa Ana - 6 - Kimley -Horn and Associates, Inc. <br />MND for McDonald's Restaurant April 30, 2010 <br />25G -18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.