Laserfiche WebLink
<br /> <br /> <br /> AECIM <br /> <br /> <br /> <br /> u <br /> <br /> 'I~ III I later within this Scope of Services. <br /> The development and construction of this project is <br /> IIIII~ ~I <br /> being undertaken by the City of Santa Ana (City), who ~ ~~~n~~l~'~ <br /> Inn <br /> will also be serving as the project's administrator for the The proposed project is to grade separate Santa Ana <br /> preliminary studies, environmental documentation, Boulevard at the Metrolink at-grade crossing. <br /> design, right-of-way engineering, right-of-way <br /> acquisition, and construction. <br /> The roadway width, and subsequent right of way width, <br /> The selection of the preferred alignment for the Santa will be determined based upon the City's General Plan <br /> Ana Boulevard Grade Separation will require the for Santa Ana Boulevard, as reinforced by the projected <br /> approval of the City and SCRRA/OCTA. The selection of traffic volumes generated by our traffic studies, as <br /> the locally preferred alternative, early in the project described later within this scope, and the number of <br /> development process, is critical in maintaining the lanes required for the year 2035 (or 2040) to provide a <br /> schedule for the project's completion. As stakeholders minimum Level of Service required by the City. <br /> in the project, local community and business owner The vertical alignment of the road will be designed to <br /> acceptance of the recommended alignment is a conform to sight distance and safety standards. <br /> prerequisite for City approval and a successful project. <br /> The proposed project will construct a Grade Separation <br /> at the crossing of Santa Ana Boulevard, with the The proposed Santa Ana Boulevard Grade Separation, <br /> SCRRA/OCTA Metrolink line (Metrolink). Phase 1 of the and the associated retaining walls, shall be studied to <br /> Project is Preliminary Engineering, requiring an determine the most cost effective and efficient <br /> investigation as to the most cost-effective alternative structural type, and this will include both pre-cast <br /> for separating the grades, beginning with a simplified concrete and steel through plate girder alternatives. The <br /> Project Study Report Equivalent (PSRE), and crossing will also be studied in terms of providing an <br /> culminating in a Project Report Equivalent (PRE), a aesthetic bridge structure consistent with the <br /> recommendation; and submitting a Notice of Exemption surrounding community. <br /> (Statutory Exemption) as a part of the California <br /> „ „ <br /> Environmental Quality Act CEQA .Phase 1 concludes I „ <br /> with the approval of the PA/ED. Phase 2 of the Project Thel PSRE shall be prepared similar to CALTRANS' <br /> development will require right-of-way acquisition, final regulations, policies, procedures, manuals and <br /> design: plans, specifications and cost estimates for the standards. The following items a. through d. are not all- <br /> construction ofproject; and relocation of utilities. We inclusive but are intended only to illustrate types of <br /> shall submit a CD to the City, which will include all sources. <br /> surveying, environmental reports, technical studies, the <br /> PSRE, the PRE, the design files, both plans and a. The PSRE will be prepared similarto Caltrans' <br /> specifications, and any supporting documents produced Project Development Procedures Manual <br /> during the course of the project development. This Appendix L -Preparation Guidelines for Project <br /> scope of services is written for Phase 1 only. Study Report. <br /> b. Roadway design shall be in general <br /> <br /> ~ conformance with the current CALTRANS <br /> Highway Design Manual, Standard Plans and <br /> AECOM shall provide professional and technical Specifications in English Units. <br /> engineering services necessary to investigate alignment c. Plans and estimates shall be prepared in <br /> alternatives, prepare a PSRE, documenting potential general conformance with the current editions <br /> solutions tothe project's purpose and need; a PRE, oftheCALTRANS Plans, Specifications and <br /> recommending an alternative; and providing the Estimates Guide, Standard Plans and Standard <br /> necessary documentation to obtain environmental Specification, and Basic Engineering <br /> clearance. Work will include, but not necessarily be Estimating System or as required by the City. <br /> limited to, preliminary engineering, field surveys, d. This PSRE shall be performed in accordance <br /> obtaining SCRRA/OCTA design requirements, traffic with CALTRANS and AASHTO standards and <br /> studies, geometric layouts, preliminary right-of-way practices. Any exceptions to applicable design <br /> layouts, and order of magnitude cost estimates. AECOM standards shall be approved by the City via the <br /> shall assist the City in any public meetings, City Council process outlined in CALTRANS' Highway Design <br /> presentations, and meetings with area business Manual and appropriate memorandums and <br /> owners. The work in Phase 1 is more fully described design bulletins published by CALTRANS. <br /> r~i f~, <br /> fr. ~~,.~~.o~, <br /> <br /> IE~:~ir~l~~s~l fir p~~:~~r~~e~t t~~~y Re~~~~r~~~: I~;q~uiiv~~e~~~~: ~ir~ ~ I::' ~'i p~~:~~l~in~ fair <br /> w,~~~ ir~~ Il~~l~v~ir~ r~~ e ~~~r~t'i~n I~° r~"eat <br /> ~ ~ ' <br />