Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> • Mapping and design information from the City for improvement projects; <br /> • Hazardous material/waste information; <br /> - Preliminary materials (geotechnical) information; <br /> • Traffic data (existing and forecasted traffic, level of service, capacity adequacy, operational analysis, <br /> accidents, etc.); and <br /> • Right-of-way and utility plans. <br /> Task 1.3 Topo/Base/Field Work/Design Surveys <br /> Control Surveys <br /> Horizontal and vertical corridor control will be established along the corridor to support the aerial photogrammetry, <br /> land net surveys, engineering surveys and future design and construction activities along the corridor. The survey <br /> control will be set in accordance with Caltrans survey standards and will be tied into the North American Datum of <br /> 1983 (NAD83 NSRS 2007) and the North American Vertical Datum of 1988 (NAVD88 Riverside County) or as <br /> specified by the client. <br /> Land Net Surveys and Mapping <br /> This task entails cadastral research within Caltrans District 12 and the County of Orange for existing centerline and <br /> right-of-way files and/or available cadastral records in support of the centerline and right-of-way of 1-5, Santa Ana <br /> Boulevard, and Lincoln Street. <br /> Field surveys will be performed to locate the centerline. In addition, key monuments will be located in order to <br /> calculate the centerline of the corridor and adjacent intersecting routes. The right-of-way will be based upon record <br /> calculations only and will not be surveyed. <br /> A land net base map will be prepared at a scale comparable to the aerial mapping and will include said record <br /> centerlines and rights-of-way as well as underlying cadastral information, ownership information as recorded with the <br /> Riverside County assessor's office. All these data will be incorporated with the aerial mapping and delivered in a <br /> Microstation v8 format. <br /> Photogrammetric Mapping <br /> The aerial mapping will be prepared in conformance with Caltrans CAD mapping standards and photogrammetric <br /> specifications. Horizontal and vertical aerial control panels will be set to meet aerial triangulation requirements. The <br /> mapping will be prepared to 1" = 50' scale with 1-foot contours and will be delivered in a Microstation v8 format. <br /> Survey crews will field verify the aerial mapping to delineate planimetrics obstructed by tree coverage or shadows and <br /> to verify the contours and spot elevations generated from the aerial mapping. <br /> A color digital orthophoto with 3" pixel resolution will be prepared from the 50-scale imagery. The digital orthophoto <br /> will cover the same mapping limits described above. <br /> Task 1.4 Traffic Operations Analysis <br /> We will prepare a traffic operations analysis for the Santa Ana Boulevard grade separation project. The traffic <br /> operations analysis will examine existing and forecast future year conditions in the vicinity of the OCTA/SCRRA at- <br /> grade crossing with Santa Ana Boulevard. The future year conditions examined will be the project opening year and <br /> the project design year (20 years after opening, assumed to be 2035). Conditions examined will include the No Project <br /> Alternative and up to three build alternatives. <br /> City of Son/P A- <br /> 25G-155 <br />