My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - ENGINEERING SRVS GRADE SEPARATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/04/2011
>
25G - ENGINEERING SRVS GRADE SEPARATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:55:46 PM
Creation date
1/4/2011 7:05:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25G
Date
1/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> rail profile. In order to facilitate the traffic staging/handling during the construction, the walls constructed parallel <br /> to Santa Ana Boulevard could be constructed using "top-down" construction; that is to build the wall first, and <br /> then excavate the roadway in front of the wall to final grade. We will perform Value Analysis to determine the <br /> most cost effective retaining wall type, top down approach vs. conventional cantilever retaining wall using <br /> temporary shoring. <br /> A Single Span Structure Alternative can also be considered. The span length required to span the Santa Ana <br /> Boulevard roadbed is approximately 134'. The typical span range for this type of construction extends to about <br /> 150-ft under Cooper E-80 loading. Therefore, even though the required span is nearing the upper limit of the <br /> typical structure span length, this structure type is suitable for construction of new underpass. The total structure <br /> depth for the replacement of the double track would be approximately 13'-6"_ Provisions can be made in the <br /> bridge design so that is capable of supporting a future third track, should this become a requirement of <br /> OCTA/SCRRA. To support a possible third track, the through girder, on the either left or right side of the <br /> underpass, will be required to have a structure depth approaching 15' in order to support the full weight of a <br /> Cooper E-80 live load. <br /> During the APS development, through a careful and deliberate process, we will study a number of different <br /> structure alternatives and configurations against various interchange alternatives, and develop associated costs. <br /> Deliverables: Draft and Final Structure Type Selection Report <br /> Task 1.7 Existing and Future Utilities Issues/Permitting <br /> Utility Impacts/Coordination <br /> We will identity and coordinate with the various utility companies for the location and descriptions of their facilities, <br /> including any potential for future utility improvements. <br /> Utility Meetings and Utility Coordination <br /> Coordinate and schedule meetings with Utility Owners and project stake holders as may be required. <br /> Existing Utility Research <br /> We will provide utility research services to include: <br /> • Notify Underground Service Alert and request a listing of member utility companies within the project <br /> area. <br /> - Make a field reconnaissance of the utilities within the project area. <br /> • Send a written notice to the identified utility companies in the proposed project area notifying them of the <br /> proposed project, and request copies of their existing utility maps and information regarding their plans for <br /> future improvements- <br /> • Prepare a preliminary Utility Conflict Maps from record information and field observations showing those <br /> utilities to be protected in place and those to be relocated to clear construction. <br /> • Overhead lines will be located and vertical clearance will be determined over the proposed improvements <br /> to assure that minimum vertical clearance is maintained. <br /> - Determination of prior rights as they relate to responsibility for the cost of relocations. <br /> Ci[y S-1-4- <br /> 25G-159 <br />
The URL can be used to link to this page
Your browser does not support the video tag.