My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-01-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/04/2011
>
FULL PACKET_2011-01-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:55:20 PM
Creation date
1/4/2011 12:28:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/4/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
546
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> Railroad <br /> Track Design <br /> Provide track design plans, draft shoofly layout plans, to include shoofly track geometry plans, mainline track geometry <br /> plans, shoofly typical sections, mainline typical sections, track grading plans, and special trackwork plans. <br /> Railroad Coordination <br /> We will coordinate with the SCRRA/OCTA regarding alternative grade separation study alternatives, including <br /> additional trackage, construction activity constraints due to train operations, both freight and passenger trains, <br /> clearances, modifications to and reconstruction of a temporary at-grade crossing to facilitate construction of the grade <br /> separation. <br /> Railroad Permitting <br /> We will be responsible for assisting the SCRRA/OCTA in obtaining the Agreement with the SCRRA/OCTA. This will <br /> be done by: <br /> • Coordinate with the SCRRA/OCTA during the development of the preliminary plan for the grade <br /> separation and solicit their input and separation requirements. <br /> • Request the SCRRA/OCTA to prepare the Construction and Maintenance Agreement. <br /> • Meet and confer with the SCRRA/OCTA regarding the terms and conditions of the Agreement. <br /> • Furnish plans and cost estimates to the SCRRA/OCTA for said agreement. <br /> • Coordinate with the Project Surveyor for the legal descriptions for the permanent bridge crossing of the <br /> SCRRA/OCTA right of way and the temporary construction easement. <br /> • Monitor and coordinate the development of the Agreement with the SCRRA/OCTA and the City. <br /> • Keep City updated with regards to the progress of the Agreement development. <br /> • Make recommendations to the City regarding the terms of project specific conditions addressed in the <br /> Agreement. <br /> • With City concurrence, negotiate with the SCRRA/OCTA the terms of project specific conditions. <br /> • Coordinate with and provide assistance to the City staff and City attorney regarding the terms of the <br /> agreement. <br /> • Coordinate the development and approval by the SCRRA/OCTA of shoofly plans. Shoofly plans prepared <br /> by AECOM. <br /> • Coordinate the development and approval by the SCRRA/OCTA of temporary at grade crossing for the <br /> shoofly. <br /> Deliverables: City/Railroad Construction and Maintenance Agreement <br /> City of Sonta Ana <br /> 25G-157 <br />
The URL can be used to link to this page
Your browser does not support the video tag.