<br /> <br /> <br /> <br /> <br /> Deliverables: Preliminary Utility Conflict Maps <br /> Utility Data Summary; Including a matrix of: Utility Owners, Utility <br /> Representatives, Description of Utility Conflicts and Responsibility for the cost of <br /> relocation. <br /> Task 1.8 Right of Way Requirements <br /> ROW Identification/Impacts/Data Sheets <br /> Existing right-of-way information, including parcel boundaries will be shown on the alternative layout plans and used <br /> to determine the preliminary right-of-way requirements, which may be required for each alternative alignment. The <br /> cost of potential right-of-way acquisitions, if any, will be included in the cost estimate for each alternative. Legal <br /> descriptions will be prepared, and it is assumed up to 50 (this is excessive, but conservative) shall be required, and this <br /> shall be determined during the design. <br /> As the proposed alternative layout sheets are refined to include the information required for the PRE, the impacts to <br /> right-of-way will also be more thoroughly defined. This updated information will be shown on the right-of-way layout <br /> sheets and used to determine the preliminary right-of-way requirements for each alternative alignment. The cost of <br /> potential right-of-way acquisitions, including construction easements, will be included in the cost estimate for the PRE. <br /> A Right-Of-Way Data Sheet will be prepared and included in the PRE. During the design, right of way needs will be <br /> mapped for use in the right of way acquisition phase of the project. <br /> Deliverables: Right of Way Requirements Maps <br /> Task 1.9 Drainage Analyses/Report <br /> Hydrology Study/Report <br /> AECOM will prepare a hydrology study for the project area in order to recommend drainage systems adequate for the <br /> project improvements. These recommendations will be in the form of drainage plans, and associated cost estimates for <br /> these facilities, for inclusion into the PRE, and will ultimately form the basis of the Hydrology and Hydraulics Report <br /> prepared during the PS&E phase of the project- <br /> Deliverables: Storm Water Data Report <br /> Task 1.10 Quantities, Schedule and Estimate <br /> AECOM will calculate the preliminary level quantities, produce a preliminary level cost estimate, and produce a <br /> preliminary project schedule for inclusion into the PRE. <br /> Task 1.11 Project Report Equivalent (Draft and Final) <br /> AECOM will produce a Project Report, per the requirements previously mentioned in this document. <br /> Deliverables: Project Report Equivalent (Draft and Final) <br /> Task 1.12 Environmental Documentation <br /> As with all projects the environmental phase of the project controls the schedule. In order for us to have a firmer grasp <br /> on this critical part of the schedule, we have included on our team an Environmental Manager. Ms. Alicia Colburn will <br /> be serving in this capacity for the duration of the environmental clearance process. <br /> City of Santa A- <br /> 25G-160 <br />