Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> CUP NO. 2010-23 <br /> DECEMBER 13, 2010 <br /> PAGE 2OF4 <br /> <br /> <br /> c. Branches should exceed all antennas by a minimum of 12 inches. <br /> d. Branches should start at 15 feet above the ground. <br /> <br /> e. There should be a minimum space of seven feet between the top of the <br /> antenna and the top of the branches. <br /> f. Branches should have an upward sweep similar to that of actual Canary <br /> Island Pines. <br /> g. Branch foliage color should be an olive green with some brown <br /> "needles" to match an actual Canary Island Pine. A sample should be <br /> submitted for approval prior to fabrication. <br /> <br /> h. Full bark cladding with a custom color should be submitted for approval <br /> prior to fabrication. <br /> i. All antennas shall be covered with "pine antenna socks" that match the <br /> approved foliage color. <br /> j. All "stand-off mounts" and support pipe mounts shall be concealed <br /> behind antennas and painted a darker shade or green (or black) with a <br /> "flat" paint finish to reduce reflection and visibility of the mounting. <br /> k. Include the tree specifications (selected manufacturers and models) with <br /> photo simulations (also a site plan review requirement). <br /> <br /> 1. Show the location of the GPS antenna on all elevations. <br /> m. Provide a "unistrut" detail for the utility cabinet; an "H-frame" is not <br /> acceptable. <br /> n. Provide a note on the plans stating "install underground utilities sleeving <br /> for two carriers during construction of the structure". Shrouds on the <br /> outside of the pole are not acceptable. <br /> <br /> o. All exterior conduit and electrical meters shall be installed and screened <br /> in one metal enclosure painted to match the structure. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Resolution No. 2010-19 <br /> Page 5of7 <br /> 31 A-15 <br />