My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05 - JOINT DT Parking and Wayfinding
Clerk
>
Agenda Packets / Staff Reports
>
Successor Agency (Formerly the Community Redevelopment Agency) (1974-Present)
>
COMMUNITY REDEVLOPMENT AGENCY(1974-2012)
>
2010-2012
>
2011
>
03/07/2011
>
05 - JOINT DT Parking and Wayfinding
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:33:00 PM
Creation date
3/10/2011 11:09:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
05
Date
3/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM Hourly Rate Schedule-Santa Ana On-Gail Contract <br />Note: 2099 rates reflect 2% increase from 2010 <br />Classification 2010 Billing Rates 2011 Billing Rates <br />Project Director <br /> $218.48 $222.85 <br />Protect Manager <br /> $199.20 $203.18 <br />Technical Specialist <br /> $183,14 $186.80 <br />Principal Engineer <br /> $164,93 $168.23 <br />Project Controls Manager <br /> $146.73 $149.66 <br />Senior Engineer <br /> $142,44 $146,29 <br />Engineer <br /> 124.24 $126,72 <br /> <br />Senior CAD Designer _ <br /> $124.24 $12fi.72 <br />Associate Enginoer <br /> $103.89 $105.97 <br />Project Controls Specialist <br /> $97.46 $99.41 <br />Assistant Engineer <br /> $94.25 $96.14 <br />CAD Drafter <br /> $83,54 $85.21 <br />Administrative Assistant <br /> $70.69 $72.10 <br />~i.-,(?;.~ivl iran;;~r)rlalinn }AECOM <br />
The URL can be used to link to this page
Your browser does not support the video tag.