My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-03-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/21/2011
>
FULL PACKET_2011-03-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 1:35:45 PM
Creation date
3/23/2011 2:49:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
3/21/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
674
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "C" <br />Cost Proposal <br />i. itemized Estimated Breakdown for CM Services <br />A. Personnel by Classiilcatlon /Responsibility <br />The following cost proposal assumes that the Contractor will have idle time due to rainy seasons. <br />TOTAL ESTIMATED PERSONNEL COST $ 734,698.00 <br />B. Additional Resident Engineer and Inspection Services it No Idle Time is Utilized <br />by the Contractor and Subject to City Approval. <br />Reimbursables Quantity Cost_ <br />Construction Manager /Resident Engineer As <br />Needed $170.00 / hour <br />Construction Inspector As <br />Needed $130.00 / hour <br />Category Subtotal $52,802.00 <br />Subtotal of A and 8 = $ 787,500.00 <br />City of Santa Ana I Public Works Agency Page ( 1 <br />First Street Bridge Replacement I Construction Management <br />25E -45 <br />Estimated Hours <br />Personnel <br />Hourly Rate <br />by Category <br />CM /RE <br />Construction Manager /Resident Engineer <br />$ <br />170.00 <br />1,248 <br />Subtotal <br />$ <br />212,160.00 <br />Inspections <br />Construction inspector <br />$ <br />130,00 <br />3,120 <br />Subtotal <br />$ <br />405,600.00 <br />Category Subtotal <br />$ <br />617,760.00 <br />Office Engineering /Project Controls <br />Diaz Consultants - DBE subconsultant <br />Office Engineer /Project Controls /Office Assistance <br />As Required <br />Subtotal <br />$ <br />52,479.00 <br />WRC Consulting LIDBE subconsultant <br />Office Engineer /Project Controls /office Assistance <br />$ <br />As Required <br />Subtotal <br />$ <br />64,459.00 <br />Category Subtotal <br />$ <br />116,938.00 <br />TOTAL ESTIMATED PERSONNEL COST $ 734,698.00 <br />B. Additional Resident Engineer and Inspection Services it No Idle Time is Utilized <br />by the Contractor and Subject to City Approval. <br />Reimbursables Quantity Cost_ <br />Construction Manager /Resident Engineer As <br />Needed $170.00 / hour <br />Construction Inspector As <br />Needed $130.00 / hour <br />Category Subtotal $52,802.00 <br />Subtotal of A and 8 = $ 787,500.00 <br />City of Santa Ana I Public Works Agency Page ( 1 <br />First Street Bridge Replacement I Construction Management <br />25E -45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.