Laserfiche WebLink
EXHIBIT "C" <br />Cost Proposal <br />i. itemized Estimated Breakdown for CM Services <br />A. Personnel by Classiilcatlon /Responsibility <br />The following cost proposal assumes that the Contractor will have idle time due to rainy seasons. <br />TOTAL ESTIMATED PERSONNEL COST $ 734,698.00 <br />B. Additional Resident Engineer and Inspection Services it No Idle Time is Utilized <br />by the Contractor and Subject to City Approval. <br />Reimbursables Quantity Cost_ <br />Construction Manager /Resident Engineer As <br />Needed $170.00 / hour <br />Construction Inspector As <br />Needed $130.00 / hour <br />Category Subtotal $52,802.00 <br />Subtotal of A and 8 = $ 787,500.00 <br />City of Santa Ana I Public Works Agency Page ( 1 <br />First Street Bridge Replacement I Construction Management <br />25E -45 <br />Estimated Hours <br />Personnel <br />Hourly Rate <br />by Category <br />CM /RE <br />Construction Manager /Resident Engineer <br />$ <br />170.00 <br />1,248 <br />Subtotal <br />$ <br />212,160.00 <br />Inspections <br />Construction inspector <br />$ <br />130,00 <br />3,120 <br />Subtotal <br />$ <br />405,600.00 <br />Category Subtotal <br />$ <br />617,760.00 <br />Office Engineering /Project Controls <br />Diaz Consultants - DBE subconsultant <br />Office Engineer /Project Controls /Office Assistance <br />As Required <br />Subtotal <br />$ <br />52,479.00 <br />WRC Consulting LIDBE subconsultant <br />Office Engineer /Project Controls /office Assistance <br />$ <br />As Required <br />Subtotal <br />$ <br />64,459.00 <br />Category Subtotal <br />$ <br />116,938.00 <br />TOTAL ESTIMATED PERSONNEL COST $ 734,698.00 <br />B. Additional Resident Engineer and Inspection Services it No Idle Time is Utilized <br />by the Contractor and Subject to City Approval. <br />Reimbursables Quantity Cost_ <br />Construction Manager /Resident Engineer As <br />Needed $170.00 / hour <br />Construction Inspector As <br />Needed $130.00 / hour <br />Category Subtotal $52,802.00 <br />Subtotal of A and 8 = $ 787,500.00 <br />City of Santa Ana I Public Works Agency Page ( 1 <br />First Street Bridge Replacement I Construction Management <br />25E -45 <br />