My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/04/2011
>
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:48:50 PM
Creation date
3/31/2011 1:32:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
4/4/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• A significant project impact occurs when the ICU value increases by greater than .01 and <br />achieves unacceptable level of service (E or F) or worse <br />Table 8 illustrates a comparison of study intersections under Opening Year (2013) conditions. As <br />shown, the proposed project will not generate a significant impact to the intersections within the study <br />area. <br />Table 8 - Determinations of Traffic Impacts (Opening Year (2013) Conditions) <br /> AM Peak Period PM Peak Period <br /> 2013 NP 2013 WP Increase 2013 NP 2013 WP Increase <br />Signalized Intersections ICUILOS ICUILOS ICU Impact ICU/Los ICU/LOS ICU Impact <br />Main Street at Dyer Road 0.687 / B 0.692 / B .005 NO 0.839 I D 0.8401 D .001 NO <br />Main Street at MacArthur Boulevard 0.684 / B 0.688 / B .004 NO 0.6981 B 0.710 / C .012 NO <br />Main Street at Sandpointe Avenue 0.308 /A 0.328 / A .020 NO 0.481 /A 0.485 / A .004 NO <br />Main Street at Sunflower Avenue 0.405 / A 0.415 / A .010 NO 0.725 / C 0.740 / C .015 NO <br />MacArthur Place at MacArthur Boulevard 0.706 / C 0.7441 C .038 NO 0.694 / B 0.707 / C .013 NO <br />SR-55 SB Ramps at MacArthur Boulevard 0.714 / C 0.734 / C .020 NO 0.634 / B 0.658 / B .024 NO <br />SR-55 NB Ramps at MacArthur Boulevard 0.778 / C 0.793 / C .015 NO 0.6511 B 0.6691 B .018 NO <br />Red Hill Avenue at MacArthur Boulevard 0.574 / A 0.580 / A .006 NO 0.813 / D 0.8191 D .006 NO <br />Signalized Intersection HCM Method Delay/LOS Delay/LOS Delay Impact Delayll-OS Delay/LOS Delay Impact <br />SR-55 SB Ramps at MacArthur Boulevard 19.3 / B 19.61 B 0.3 NO 17.41 B 18.1 / B 0.7 NO <br />SR-55 NB Ramps at MacArthur Boulevard 20.1 / C 20.41 C 0.3 NO 16.91 B 17.41 B 0.5 NO <br />Note: ICU = Intersection Capacity Utilization. Delay is in seconds. LOS = Level of Service. <br />Table 9 illustrates the comparison of study intersections under Long Range (2035) conditions. As <br />shown, the proposed project will not generate a significant impact at any intersection within the study <br />area. <br />Table 9 - Determinations of Traffic Impacts (Long Range (2035) Conditions) <br /> AM Peak Period PM Peak Period <br /> 2035 NP 2035 WP Increase 2035 NP 2035 WP Increase <br />Signalized Intersections ICU/LOS ICUILOS ICU Impact ICU/LOS ICUILOS ICU Impact <br />Main Street at Dyer Road 0.862 / D 0.865 / D 0.003 NO 0.8921 D 0.894 / D 0.002 NO <br />Main Street at MacArthur Boulevard 0.725 / C 0.731 / C 0.006 NO 0.8091 D 0.820 / D 0.011 NO <br />Main Street at Sandpointe Avenue 0.322 / A 0.350/A 0.028 NO 0.542 / A 0.5471 A 0.005 NO <br />Main Street at Sunflower Avenue 0.6731 B 0.689 / B 0.016 NO 0.793 / C 0.8101 D 0.017 NO <br />MacArthur Place at MacArthur Boulevard 0.7631 C 0.808 / D 0.045 NO 0.776 / C 0.7941 C 0.018 NO <br />SR-55 SB Ramps at MacArthur Boulevard 07711 C 0.792 / C 0.021 NO 0.719 / B 0.744 / C 0.025 NO <br />SR-55 NB Ramps at MacArthur Boulevard 0.8331 D 0.8471 D 0.014 NO 0.691 / B 0.710 / C 0.019 NO <br />Red Hill Avenue at MacArthur Boulevard 0.636 / B 0.6421 B 0.006 NO 0.835 / D 0.840 / D 0.005 NO <br />Signalized Intersection HCM Method Delay/LOS DelaylLOS Delay Impact Delay/LOS Delay/LOS Delay Impact <br />SR-55 SB Ramps at MacArthur Boulevard 20.3 / C 20.71 C 0.4 NO 17.5 / B 18.31 B 0.8 NO <br />SR-55 NB Ramps at MacArthur Boulevard 21.4 / C 21.81 C 0.4 NO 17.6 / B 18.21 B 0.6 NO <br />Note: ICU = Intersection Capacity utmzation. Delay is in seconds. LOS = Level of Service. <br />Conclusions <br />The 2011 Traffic Study analyzed eight critical intersections for the Opening Year (2013) conditions <br />and Long Range (2035) conditions. The study found that the proposed project would have no <br />significant impact at any study intersections. No new mitigation measures are required and the <br />previous analysis in the FEIR remains adequate and complete in the area of traffic impacts. <br />MacArthur Place South EIR - 2011 Addendum <br />42 <br />75B-87
The URL can be used to link to this page
Your browser does not support the video tag.