Laserfiche WebLink
.n Leighton Consulting ( (Ab) Environmental Services <br />!,« <br />law <br />?y 2E I COST AND PRICE PROPOSAL <br /> Phase I and Phase II ESAs come in all shapes and sizes. Sites range from single parcel lots <br /> <br /> to corridors spanning many miles. For the purposes of this proposal, we have assumed a one-acre, <br /> single Assessors Parcel Number (APN) which requires a Phase I ESA, followed by a Phase II ESA. <br />cam, <br /> Based upon the Labor Allocation Table included earlier in this document, we assumed a baseline <br /> Phase I ESA would require approximately 25.5 hours to complete. Using the labor rates included in <br /> Exhibit B, this would result in approximately $3,100 In labor charges. Adding $500 for the <br />-tic, database search report (EDR or similar), a baseline Phase I ESA would cost $3,600. <br />.:, For the Phase II ESA, We assumed a geophysical survey would be performed to clear <br /> boreholes and identify subsurface anomalies followed by a soil (direct-push) investigation on the <br /> first field day (after mark-out) The second field day would consist of a soil vapor investigation with <br /> onsite mobile laboratory. Using the Labor Allocation Table for the "typical" Phase 11 ESA and the <br /> labor rates in Exhibit B, this "typical" Phase 11 ESA would cost $24,594, based upon the following <br />d. breakdown: <br /> • Geophysical Survey - $2,000 <br /> • Two days of direct-push rig - $5,200 <br /> • One day of Mobile laboratory- $2,700 <br /> Leighton labor - $14,594 <br /> <br /> We assumed one 3,000-square4oot structure is located on the property, requiring <br /> assessment for hazardous materials, namely asbestos and lead-based point. The hazardous <br /> <br /> materials survey for this building would cost approximately $2,400. This amount could vary <br /> slightly, depending on the age of the building and construction materials. <br /> Both Exhibit A, List of Key Personnel and List of Subconsultants/Subconstractors form and <br /> Exhibit B, Price Summary Sheet Schedule I - Hourly Rates form have been included in the <br />.. Appendix section. <br /> <br />tm <br />"" CITY OF SANTA ANA I RIGHT OF WAY CONSULTING AND RELATED SERVICES 1 30 <br />111 <br /> 25C-104