Laserfiche WebLink
in Leighton Consulting <br /> <br /> <br />I (A6) Environmentd) Services <br />?- more than 500 projects in southern California. We have developed strong working <br /> relationships with Gregg Drilling and Millennium Environmental because of their <br /> knowledge of the required work and regulatory environment, their work ethic, and their <br />s? <br />cost-effective approach to project execution. <br /> In most cases, Leighton would utilize a direct-push rig to collect soil and initial grab <br />as <br /> groundwater samples. This field methodology is less intrusive and considerably more cost- <br /> effective than drilling with hollow-stem auger rigs, and generates very little investigation- <br /> <br /> derived waste (IDW). When permanent groundwater monitoring wells are required, we will <br /> primarily use hollow-stem auger drilling equipment to advance soil borings for well <br /> Installation. We have installed thousands of groundwater monitoring wells from single <br /> completions in shallow water table aquifers to nested, multi-well completions in confined <br />.., and multilayered aquifers. We have designed and installed monitoring wells intended for <br /> the recovery of various for petroleum hydrocarbons Including volatile organic compounds <br /> (VOCs), various light non-aqueous phase liquids (LNAPLs - floating product), dense non- <br /> aqueous phase liquids (DNAPLs), and other dissolved compounds. Leighton will obtain all <br /> necessary permits from the appropriate regulatory agency prior to installing any monitoring <br />"` wells and will register the wells with the Department of Water Resources (DWR), as <br />`„ required. All drilling will be performed under the oversight of a Professional Geologist (PG) <br />1W <br />or Civil Engineer (CE) registered in the State of California. <br />• Sampling. Soil and/or groundwater sampling will be conducted in accordance with federal, <br />state, and local guidelines with the objective of obtaining representative samples of the <br />subsurface materials. No two projects are alike, each requiring a thorough review of <br />background information to establish an appropriate sampling plan. Leighton will include a <br />site-specific sampling plan as part of the work plan document. "this sampling plan will <br />,.. identify the media to be sampled (e.g., soil, water, soil gas, etc.), the sampling <br />ca methodology (e.g., drilling, trenching, push-probe, monitoring well, etc.), the sample- <br />containers (e.g., glass jars, brass sleeves, Encoreem, VOA vials, etc.), preservatives, and <br />sample handling and chain-of-custody procedures. <br />4157 <br />.1 <br />C21 <br />CITY OF SANTA ANA I RIGHT OF WAY CONSULTING AND RELATED SERVICES ) 22 <br />25C-94