Laserfiche WebLink
Leighton Consulting I .(A6) Environmental Services ) <br />with onsite mobile laboratory. We also assumed one 3,000-square-foot structure is located on the <br />property, requiring assessment for hazardous materials, namely asbestos and lead-based point. <br />rta• <br />eta <br />lots <br />rA <br />OW <br />w <br />USA <br />ata <br />ww <br />m <br />t,t <br />a. <br />MIS <br />I^ <br />In <br />$111% <br />fm <br />a" <br />r" <br />aw <br />I QOW to P(Oteed I - - - - <br />fzstorkal Records ReAew <br />Intende" <br />Site Recoonalssanta <br />Report Preparation <br />QAIQCReview { -_--.------'--- <br />Issue Raw Phase I ESA Report <br />(aner receipt Of commeMS) <br />'has* 15 ??`-- <br />Develop work Plan <br />USAA1804ark-out i <br />Silo Salety PlaniTketd Preparation IV <br />Gecphyskal survey I - - ---- - - - ` -- <br />Hazardous Mated4s Survey (Yusla) <br />Hazardous Materiels Report <br />sorb VaporrDwect Push tmesUgOon I <br />Data Anatysis l <br />L_ .. _ <br />Repot Preparation <br />QAQC ReMeW <br />Issue Mal Phase 11 Report t ... _.. __ .. _ <br />Remedial Action Plan and Remedial Action Design <br />If necessary, Leighton will prepare a Remedial Action Plan (RAP) for selected response <br />actions if requested by the City. The RAP will summarize site data gathered during the Phase I ESA, <br />Phase II EAS, and RVFS process. The RAP will address site-specific contamination issues and <br />provide the planning and implementation scenario for remediation at the site. The RAP will provide - <br />specific objectives, rough costs, and timeframes for completion of the remediation. Potential <br />alternatives will be descrlbed and the reasons for selection or rejection will be detailed. Leighton <br />will submit a draft RAP, including an implementation schedule to the City for review and approval; <br />after which, the RAP will be forwarded to the appropriate regulatory agency. <br />Prior to implementing a selected remedial alternative, Leighton will provide Remedial Action <br />Design (RAD) services tailored specifically to address site specific project requirements. We <br />CITY Of SANTA ANA I RIGHT OF WAY CONSULTING AND RELATED SERVICES ) 25 <br />25C-97