Laserfiche WebLink
E AECOM <br />22 <br />Mohan Char, PhD, PE <br />Structures Lead <br />Education and Registrations <br />PhD/1993/Structural Engineering <br />BE/1986/Civil Engineering <br />ME/1988/Structural Engineering <br />PE/1998/California, No: 57894 <br />Dr. Mohan Char has many years of experience working with Caltrans, local <br />agencies, and land developers, and developing contract documents for bridge <br />plans, specifications, and construction cost estimates (PS&E) projects. He is <br />specialized in seismic nonlinear time -history and nonlinear time dependent creep/ <br />shrinkage analyses. He has an intimate knowledge of the Caltrans procedures for <br />development of project -specific standard special provisions. He has been involved <br />in several challenging structural projects for interchanges, grade separations, <br />freeway overcrossings and undercrossings, railroad overheads and underpasses, <br />major toll bridges, and bridge widenings. <br />• Monte Vista Grade Separation over UPRR, Montclair, California <br />• Auto Center Drive Grade Separation over BNSF, Corona, California <br />• Dillon Road Grade Separation over UPRR, Coachella, California <br />• Ramona Boulevard Grade Separation over UPRR+Metrolink, El Monte, <br />California <br />• University Parkway/State Street Grade Separation over BNSF, San <br />Bernardino, California <br />• Compton Creek UPRR Railroad Bridge and Utility Bridge, Rancho Dominguez, <br />California <br />Tim Erney, AICP Mr. Erney is the transportation engineering department manager and a senior <br />Traffic Studies/TMP project manager for the AECOM Los Angeles office. He has successfully managed <br />over 100 transportation planning and engineering projects throughout California. <br />Education and Registrations He is a certified professional planner with experience managing analyses and <br />MS/1997/Transportation Engineering documentation for environmental review projects, access and circulation studies, <br />MCP/1997/City and Regional Planning sustainable transportation practices, TDM measures, parking evaluations, <br />BS/1995/Mechanical Engineering pedestrian and bicycle reviews, and data collection programs. Other experience <br />AICP/2000/United States, No: 015998 includes detailed technical analysis of local and regional roadway facilities, <br />Professional Transportation Planner includingtraffic forecasting, modal split analyses, traffic diversion, and operational <br />analyses. He has experience coordinating with local and regional transportation <br />and environmental agencies in Southern California. <br />• Nogales Street Grade Separation (LA Subdivision), Alameda Corridor East, <br />Los Angeles, California <br />• Temple Avenue and Baldwin Park Grade Separations, City of Industry, <br />California <br />• Puente Avenue Grade Separation Feasibility Study, City of Industry, <br />California <br />• Los Angeles Metro Exposition Line Phase II Technical Studies, Los Angeles <br />County, California <br />• Third Street Light Rail Project US 101 Overcrossing Project Study Report/ <br />Project Report, San Francisco, California <br />• Los Angeles Metro Exposition Line Phase II Technical Studies, Los Angeles <br />County, California <br />• Anaheim Fixed -Guideway Project, Anaheim, California <br />• Port of Hueneme Truck Access Study, Ventura County, California <br />Proposal for Project Study Report Equivalent and Conceptual Engineering Plans for <br />Santa Ana Bowe+-ard Grade Separation Project <br />