My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - AA - IECGP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/18/2011
>
55A - AA - IECGP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:47:01 PM
Creation date
4/14/2011 4:09:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
55A
Date
4/18/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• October 1 - December 31; Due January 30 <br />• January 1 - March 31; Due April 30 <br />• April 1 - June 30; Due July 30 <br />• July 1 - September 30; Due October 30 <br />2. Semi-Annual Assistance Progress Report (SAPR). Following an award, the <br />awardees will be responsible for providing updated obligation and expenditure <br />information on a semi-annual basis. The applicant is responsible for completing and <br />submitting the SAPR reports. The awardee should include a statement in the <br />narrative field of the SAPR that reads: See BSIR <br />The SAPR is due within 30 days after the end of the reporting period (July 30 for the <br />reporting period of January 1 through June 30; and January 30 for the reporting <br />period of July 1 though December 31). Future awards and fund drawdowns may be <br />withheld if these reports are delinquent. <br />SAPRs must be filed online at httos://prants.oiP.usdoi.gov. Guidance and <br />instructions can be found at httos://grants.oio.usdoj.gov/gmsHelp/index.html. <br />Required submission: SAPR (due semi-annually). <br />3. Initial Strategy Implementation Plan (ISIP). Following an award, the awardees will <br />be responsible for providing updated obligation and expenditure information to meet <br />the pass-through requirement. The applicable SAAs are responsible for completing <br />and submitting the ISIP online. <br />Required submission: ISIP (due within 45 days of the award date). <br />4. Biannual Strategy Implementation Reports (BSIR). Following an award, the <br />awardees will be responsible for providing updated obligation and expenditure <br />information on a semi-annual basis. The applicable SAAs are responsible for <br />completing and submitting the BSIR reports which is a component of the SAPR. <br />The BSIR submission will satisfy the narrative requirement of the SAPR. SAAs are <br />still required to submit the SAPR with a statement in the narrative field that reads: <br />See BS1R. <br />The BSIR is due within 30 days after the end of the reporting period (July 30 for the <br />reporting period of January 1 through June 30; and January 30 for the reporting <br />period of July 1 though December 31). Updated obligations and expenditure <br />information must be provided with the BSIR to show progress made toward meeting <br />strategic goals and objectives. Future awards and fund drawdowns may be withheld <br />if these reports are delinquent. <br />Required submission: BSIR (due semi-annually). <br />36 <br />55A-42
The URL can be used to link to this page
Your browser does not support the video tag.