My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - JOINT - SETTLEMENT AGMT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/18/2011
>
80A - JOINT - SETTLEMENT AGMT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:47:28 PM
Creation date
4/18/2011 3:07:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
80A
Date
4/18/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 5 Statement of Overriding Considerations <br />CHAPTER 5 Statement of Overriding <br />Considerations <br />5.1 INTRODUCTION <br />Section 15093 of the CEQA guidelines states: <br />(a) CEQA requires the decision-making agency to balance, as applicable, the economic, legal, social, <br />technological, or other benefits of a proposed project against its unavoidable environmental risks <br />when determining whether to approve the project. If the specific economic, legal, social, <br />technological, or other benefits of a proposed project outweigh the unavoidable adverse <br />environmental effects, the adverse environmental effects may be considered "acceptable." <br />(b) When the lead agency approves a project which will result in the occurrence of significant effects <br />which are identified in the final EIR but are not avoided or substantially lessened, the agency shall <br />state in writing the specific reason to support its actions based on the final EIR and/or other <br />information in the record. The statement of overriding considerations shall be supported by <br />substantial evidence in the record. <br />(c) If an agency makes a statement of overriding considerations, the statement should be included in <br />the record of the project approval and should be mentioned in the notice of determination. This <br />statement does not substitute for, and shall be in addition to, findings required pursuant to Section <br />15091. <br />This Statement of Overriding Considerations describes the anticipated economic, social, and other <br />benefits or other considerations of the Proposed Project to support the decision to proceed with the <br />project even though not all of the identified impacts are mitigated to a less-than-significant level. <br />5.2 UNAVOIDABLE SIGNIFICANT ADVERSE IMPACTS <br />Even with mitigation measures identified in the EIR for the project, the following significant impacts are <br />unavoidable because no feasible mitigation is available to further reduce the impacts to a less-than- <br />significant level. Refer to Chapter 2 (CEQA Findings) for further clarification regarding the impacts <br />listed below. <br />Aesthetics <br />Impact 4.1-5 Long-term cumulative development occurring pursuant to the Transit Zoning <br />Code (SD 84A and SD 84B) would result in a substantial increase in <br />shade/shadows over sensitive uses. <br />Cumulative As noted in the discussion for Impact 4.1-5, new sources of increased shade <br />would likely result from new development under the proposed Transit Zoning <br />Code (SD 84A and SD 8413). Since there is typically no feasible mitigation <br />available to reduce to less than significant or eliminate shading impacts, significant <br />and unavoidable shading impacts would result from the proposed Transit Zoning <br />Code (SD 84A and SD 8413). Cumulative development of additional medium- and <br />Revised Station District Project and FOL Settlement Agreement Findings of Fact/Statement of Overriding 5-5 <br />Considerations 8OA-98
The URL can be used to link to this page
Your browser does not support the video tag.