My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-022 - Addendum to the FInal Environmental Impact Report No. 2004-02
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2011
>
2011-022 - Addendum to the FInal Environmental Impact Report No. 2004-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2014 11:48:24 AM
Creation date
4/22/2011 1:51:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2011-022
Date
4/4/2011
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Trips <br />Project Trip Distribution <br />Figure 8 through Figure I l illustrate the anticipated project inbound and outbound trip distribution <br />pattern for the estimated opening year and long range conditions, extracted from the previous approved <br />traffic study. These figures indicate the proportion of project traffic that will use the street segments <br />and turning movements indicated. According to the previous report, the distribution was originally <br />obtained from the QCTAM model select zone model run. The key difference between the opening year <br />and long range distribution is that an Alton Avenue overpass is proposed at the SR -55 freeway with <br />direct connections to the SR -55 HQV lanes. The HQV interchange was not implemented in project <br />opening year but is to be included in the long range condition. The traffic which will utilize Alton <br />Avenue and the HQV interchange in long range conditions was manually distributed to the parallel <br />roadway — MacArthur Boulevard. <br />The AM and PM peak hour project -only traffic volumes for the Opening Year (2013) are shown in <br />Figure 12 while the AM and PM project -only traffic volumes under the Long Range (2035) Conditions <br />are shown in Figure 13. Future traffic levels in the project vicinity are expected to be changed by the <br />amounts shown on these figures. <br />KOA CORPORATION Updated Main and MacArthur Development Project <br />PLANNING & ENGINEERING 21 Traffic Impact Study in City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.