My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-022 - Addendum to the FInal Environmental Impact Report No. 2004-02
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2011
>
2011-022 - Addendum to the FInal Environmental Impact Report No. 2004-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2014 11:48:24 AM
Creation date
4/22/2011 1:51:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2011-022
Date
4/4/2011
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 5 — Proposed Overall Site Trip Generation Summary <br />Land Use <br />ITE Code <br />Quantity <br />Peak Hour <br />AM <br />PM <br />Daily <br />In Out Total <br />In Out Total <br />Opening Year (2013) <br />Condominium Project <br />(5 story condo) <br />230 <br />300* dwelling units <br />21 <br />111 <br />132 <br />105 <br />51 <br />156 <br />1 ,743 <br />Lake Towers (High -rise <br />Apartment) <br />222 <br />175 dwelling units <br />14 <br />39 <br />53 <br />37 <br />25 <br />61 <br />735 <br />Business Hotel <br />312 <br />185 occupied rooms <br />63 <br />44 <br />107 <br />fib <br />46 <br />115 <br />11345 <br />Subtotal <br />98 <br />194 <br />292 <br />210 <br />122 <br />332 <br />31823 <br />Internal capture (5 %) <br />5 <br />10 <br />15 <br />11 <br />6 <br />17 <br />191 <br />Total <br />93 <br />184 <br />277 <br />200 <br />116 <br />315 <br />3,632 <br />Long Range (2035) <br />Condominium Project <br />(5 story condo) <br />230 <br />300* dwelling units <br />21 <br />111 <br />132 <br />105 <br />51 <br />156 <br />1,743 <br />Lake Towers (High -rise <br />Apartment) <br />222 <br />175 dwelling units <br />14 <br />39 <br />53 <br />37 <br />25 <br />fit <br />735 <br />Condominium Project <br />(Cinema Tower) <br />222 <br />150 dwelling units <br />9 <br />42 <br />51 <br />36 <br />21 <br />57 <br />627 <br />Business Hotel <br />312 <br />185 Occupied Rooms <br />63 <br />44 <br />107 <br />fib <br />46 <br />115 <br />1,345 <br />Subtotal <br />107 <br />236 <br />343 <br />246 <br />143 <br />389 <br />41450 <br />Internal Capture (5 %) <br />5 <br />12 <br />17 <br />12 <br />7 <br />19 <br />222 <br />Total <br />102 <br />224d <br />326 <br />234 <br />1 136 <br />370 <br />41 227 <br />Source: ITE (Institute of Transportation Engineers) Trip Generation Manual, 80 Edition, 2008 <br />*Expanded from 276 du to 300 du in comparison with the Addendum to Final Environmental Impact Report No. 2004 -02, March 2009. <br />Opening year conditions with a total of 300 dwelling units (175 "for- rent" units) and a 185 -room <br />business hotel generate approximately 3,632 daily trips with 277 AM peak hour trips and 315 PM peak <br />hour trips. Long -term conditions with a total of 450 dwelling units (300 dwelling units in 5 -story <br />buildings plus 154 dwelling units in the Cinema Tower), 175 for -rent condominium units and a 185 - <br />room business hotel will generate 4,227 daily trips with 326 AM peak hour trips and 374 PM peak <br />hour trips. <br />Project trip distribution has been modified slightly from the original traffic study analysis. The 2411 <br />Traffic Study includes a proposed Alton Avenue overpass at the SR -55 freeway with direct <br />connections to the SR -55 HOV lanes. The interchange was not considered in project opening year, but <br />was included in the long -range 2435 analysis. Traffic projected to utilize Alton Avenue and the HOV <br />interchange was manually distributed to the parallel roadway — MacArthur Boulevard. The re- <br />distributed traffic is a beneficial feature to long -range trip distribution patterns. <br />Opening Year (2013) With .Project Conditions <br />Table 6 illustrates the result of the level of service analyses for opening year. As indicated in the table, <br />all intersections will operate at acceptable LOS for the opening year with project conditions. <br />MacArthur Place South EIR — 2011 Addendum 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.