My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-06-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
06/06/2011
>
FULL PACKET_2011-06-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2016 4:17:05 PM
Creation date
6/3/2011 9:59:09 AM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12.3 Infield turf shall be aerated using a walk behind piston type aerator as often as deemed necessary by Staff. <br />12.4 Infield turf shall be kept weed free at all times. 12.4.1 Any grasses other than the original hybrid Bermuda <br />installed in the infield shall be eradicated immediately upon notice. The Contractor may choose the method <br />of eradication, however, may not damage the turf. <br />12.4.2 Any broadleaf weeds shall be eradicated immediately upon notice. The Contractor may choose the <br />method of eradication, however, may not damage the turf. <br />12.5 Infield turf shall be kept free of disease and rodents at all times. <br />12.5.1 The Contractor shall be responsible for identifying and treating any diseases or rodents immediately <br />upon notice. <br />12.6 Infield turf annual renovation <br />12.6.1 Each year the infield turf shall be renovated: 1) verticut using the greens reel mowers straight blade <br />reels; 2) mowed to 1/4" high immediately following verticutting; 3) overseeded with Stovers Seed <br />Company Sahara Dunes at a rate of 8 pounds of seed per 1,000 square feet; and, 4) top dressed <br />immediately following seeding by Materials using "Santa Ana Top Dress Mix." <br />13.0 General Contract Provisions <br />13.1 Contractor shall provide and is responsible for all equipment necessary to carry out the work outlined in the <br />contract. There will be no available storage for equipment. Contractor will be responsible for bringing in and <br />then removing all equipment necessary to carry out the work outlined in the contract. <br />2 UIF- 3 %F %0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.