My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-06-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
06/06/2011
>
FULL PACKET_2011-06-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2016 4:17:05 PM
Creation date
6/3/2011 9:59:09 AM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
representative reserves the right to issue a Stop Work Notice if the Contractor does not <br />promptly repair any damage, within twenty -four (24) hours of the damage incurred. <br />If the SAPRF representative requests or directs the Contractor to perform work in a given <br />area, it will be the Contractor's responsibility to verify and locate any underground <br />systems (i.e. utility lines) and take responsibility for taking reasonable precaution when <br />working in these areas. <br />Contractor shall call Underground Alert (800) 422 -4133) at least two working days prior <br />to digging for line locations. Any damage or problems shall be reported immediately to <br />the SAPRF representative and the City of Santa Ana. If the Contractor discovers <br />something unexpected or a unique problem occurs, he should stop work and immediately <br />contact an authorized SAPRF representative for a timely resolution of the problem. <br />2.03 CONTRACTOR'S STAFF <br />The Contractor shall provide sufficient personnel to perform all work in accordance with <br />the specifications set forth herein. A qualified, English speaking supervisor in the employ <br />of the Contractor shall supervise all of the Contractor's personnel. The supervisor shall be <br />available at all times to the SAPRF representative during work operations. The <br />responsibility for all work performed will remain with the full -time certified arborist. <br />The Contractor shall furnish the necessary competent and key personnel to properly <br />supervise and direct the work of fully equipped, competent and experienced crews as well <br />as all safety equipment, including but not limited to, all equipment and work procedures <br />required by ANSI Z133.1 -1994. The Contractor shall secure all timekeeping, <br />bookkeeping and other necessary clerical and office work required in the performance of <br />the contract. <br />The Contractor shall be responsible for the supervision of all of his crews. He shall check <br />all of his crews regularly for proper quantity and quality of work, proper maintenance of <br />tools and equipment, and safety. <br />2.04 SUBSTITUTIONS <br />Whenever a specific type of material is specified, no substitutions shall be allowed <br />without written consent of the SAPRF representative. <br />2.05 CERTIFICATION OF MATERIALS <br />All materials shall be delivered on the site in original containers. Materials shall be <br />subject to inspection by the ARMD representative. The SAPRF representative will not <br />approve materials not meeting the SAPRF standards, and Contractor shall return any such <br />non - satisfactory items at his /her cost. <br />2.06 CONTRACTOR NEGLECT <br />Any damage to the City of Santa Ana, SAPRF, or private property, which has been <br />determined to be due to the Contractor's neglect, shall be corrected at no additional cost <br />to the City of Santa Ana or the SAPRF. <br />Page 41 of 46 <br />25E -45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.