My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HILL INTERNATIONAL INC.-2011
Clerk
>
Contracts / Agreements
>
H
>
HILL INTERNATIONAL INC.-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 10:49:24 AM
Creation date
6/23/2011 5:22:51 PM
Metadata
Fields
Template:
Contracts
Company Name
HILL INTERNATIONAL INC.
Contract #
A-2011-072
Agency
PUBLIC WORKS
Council Approval Date
3/21/2011
Insurance Exp Date
4/1/2013
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR PROPOSAL <br />CONSTRUCTION MANAGEMENT SERVICES <br />FOR <br />THE FIRST STREET BRIDGE REPLACEMENT <br />OVER THE SANTA ANA RIVER <br />1. GENERAL PROJECT DESCRIPTION <br />The City of Santa Ana plans to replace the First Street Bridge over the Santa Ana River <br />from four travel lanes to six lanes including sidewalks on both sides of the bridge. <br />The purpose of this Request for Proposal (RFP) is to solicit proposals from qualified <br />consulting firms to provide construction management services for the project. Preliminary <br />Plans and Specifications are available for review by the proposer at the office of the <br />Construction Engineer of the City of Santa Ana, located at 20 Civic Center Plaza, Ross <br />Street Annex, Third floor. <br />The City is anticipating advertising the project by January 2011, awarding by March 2011, <br />and starting construction by May 2011. However, there may be delays in selecting the <br />consultant due to the pre-award audit as required by Chapter 10 of the Caltrans Local <br />Assistance Procedure Manual. There is no longer a pre-award audit requirement for <br />contracts under $1 million dollars. <br />The proposed bridge replacement is partially funded with Highway Bridge Replacement <br />and Rehabilitation (HBRR) funds, which are administered by the Federal Highway <br />Administration (FHWA) with local oversight by Caltrans. The remaining funding is locally <br />funded by the City. The bridge is identified as bridge #5500022 in the Caltrans Bridge <br />Inventory. Construction cost of the project is estimated at $10.5 million with an estimated <br />construction time of 24 months. <br />The proposer shall prepare a fee and reimbursable expenses proposal according to <br />Subsection B of Section XI - RULES FOR PROPOSAL of this RFP. <br />The proposal shall be limited to 15 pages, excluding appendix materials. A cover letter <br />shall summarize salient points of the proposal and guarantee that the proposed personnel <br />will be committed to the project as represented, and shall not be removed or replaced <br />without the City's written consent. <br />2
The URL can be used to link to this page
Your browser does not support the video tag.