°R7
<br />i?
<br />Proposed Staff
<br />Hillis proposing a team of seasoned professionals to provide the City of Santa Ana with the confidence that it will
<br />receive the expert construction management, resident engineering, and inspection services required to make
<br />the FirstStreet Bridge Replacement a successful project. The key personnel on our proposed team includes Sean
<br />Rouhani, PE as your construction manager/resident engineer, and Jose Burbano, EIT as construction inspector.
<br />These two key personnel shall be supported, as-needed or required, by a team of specialty support staff. These
<br />support staff consist of specialty inspectors, office engineers, project controls/schedulers, and public relations/
<br />outreach. All of our proposed positions are shown on the Organization Chart below, resumes are presented in
<br />the appendix, and a chart showing relevant qualifications is provided on the following page.
<br />Key Personnel
<br />Sean Rouhanl, PE-Construction Manager/Resident Engineer (RE). Mr. Rouhani has more than 28 years
<br />of program management, project management, construction management, and resident engineering
<br />experience in interchanges, freeways, structures, grade separations, railroads, highways, roadways,
<br />and structures construction in flood control channels/waterways, including seven years with Caltrans'
<br />Division of Structures. He gained his experience working for local cities, counties, departments of
<br />transportation, and transportation authorities.
<br />He has been a construction manager/RE on over Organization Chart N w °
<br />$800 million in projects for roadway widening, - °?
<br />road reconstruction, road realignment, channel f t r
<br />reconstruction, bridge widening, and widening
<br />construction over and in flnnd enntrnl channalc
<br />Jose Burbano, EIT-Construction Inspector. Mr.
<br />Burbano is a civil engineer with more than 12 years
<br />of construction management experience working
<br />with bridge and roadway projects, including work
<br />as an assistant resident engineer on Caltrans and
<br />other public works transportation projects. His
<br />structures inspection experience includes bridge
<br />construction in flood control channels, precast/
<br />prestressed girders, bridges, retaining walls, box
<br />culverts, CIDH piles, shoring and excavations, cast-
<br />in-place post-tensioned concrete box girders, and
<br />steel structure bridges. As a roadway inspector
<br />he has worked on roadway paving, drainage,
<br />traffic signal,. and electrical systems, as well as
<br />implementing SWPPP/WPCP and safety measures.
<br />7MlchaelTahan, Principal (Hit)
<br />uheir Saleh, PE (Hit)
<br />thy T Wassil, PE (Hit)
<br />Sean Rouhani, PE (HIL)
<br />Jose Burbano, EIT (Hit)
<br />Kofi Baryeh, PE (DCI) (DBE)
<br />Lan Weber, Ph.D., PE (wRC) (UDBE)
<br /> Both Mr. Rouhani and Mr. Burbano have worked DennisMcCollum(NIL) Tony Chu, EIT(HIL)
<br />
<br />on a number of similar projects that have included Construction Inspector structures/Roadway
<br />Inspector
<br /> work in flood control channels. They understand Javier Guzman (NIL)
<br />Construction Inspector Jim Landfried, EIT(HIL)
<br /> the key requirements and ramifications of working Gabriel Flores (NIL) Office Engineer
<br /> within such an environment and accounting for I «,
<br />I LEGEfID Electrical Inspector Philip Law, PE(NIL)
<br />
<br />wet and dry conditions. They have also worked ;; Dion Castro, REA I (NIL) CPM Scheduler
<br />
<br />on similar projects that required keeping traffic Hill Htl
<br />Diaz (I)CI) SWPPP Inspector Vanessa Barrtentos{NIL)
<br />PR/Outreach
<br /> (vehicle and pedestrian) flowing safely through WRC(WRC) Steve Lodge
<br />Public Safety Officer
<br /> "-'-
<br /> construction zones and maintaining safe detours.
<br />
<br />
<br /> h 11 t City of Santa Ana I Pu blic Works Agency Page ( 2
<br /> First Street Bridge Replacement I Construction Management
<br />
<br />
|