My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HILL INTERNATIONAL INC.-2011
Clerk
>
Contracts / Agreements
>
H
>
HILL INTERNATIONAL INC.-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 10:49:24 AM
Creation date
6/23/2011 5:22:51 PM
Metadata
Fields
Template:
Contracts
Company Name
HILL INTERNATIONAL INC.
Contract #
A-2011-072
Agency
PUBLIC WORKS
Council Approval Date
3/21/2011
Insurance Exp Date
4/1/2013
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> <br />11 <br />retaining wall, varying in height from 6'-4" to 16'-4" high. The last 14 feet of the sound wall is <br />constructed on a trench footing. <br />Anticipated Construction Issues and Resolutions <br />in the table below we have identified general construction Issues we anticipate for this project and have <br />provided our proposed resolutions to these issues. <br />..Construction Issue Resolution <br />Utility Relocation issues Set up early Pre-Construction and Utility Meetings <br />• Request work plans with timelines <br />$ Pothole each utility prior to start of operations <br />• Perform QA survey of each relocation <br />$ <br />$ <br />$ <br />Q <br />D <br />D <br />D <br />6 <br />D <br />D <br />Citizen and Business • Stay proactive <br />Complaints Keep locals informed of schedules and revisions <br />• Keep Authority informed at all times <br />• Maintain proper and thorough documentation <br />• Expedite resolution <br /> Proper use of City's Public Outreach (PR)/be respectful and responsive <br />Detour Modifications • Maintain and monitor detours often <br />• Keep City Informed of potential issues <br />• Expedite approval of any changes and coordinate with City <br />• Monitor detours continuously <br />• Keep detours clean and maintain proper signage <br />• Modify detours to fit field conditions <br />• Monitor traffic control to accommodate improvements/reduce bottlenecks <br />• Maintain bike trail access/use during construction <br />Local Business and • Open accesses to residents and businesses ASAP <br />Residence Access . Maintain continuous operations while working In sensitive areas <br />_ _• Seek alternatives with contractor _ <br />Dust and Noise rY • Establish a monitoring plan during pre-construction phase . ?? <br />• Implement contract monitoring plan <br />• Continuous use of water trucks <br />• Use of soil stabilization and erosion control on disturbed areas <br />Contractor Potential Claims <br />( • <br />} <br />__ • Partner with contractor <br />Elevate issues immediately if necessary <br />Maintain proper and factual documentation <br />Create/update as-built (actual) vs. as-planned (proposed) schedule <br /> <br />Demolition Plan _ <br />Set-up pre-construction meeting with the contractor <br />• Explore the removal method. Request a presentation by the contractor. <br />• Discuss the removal plan with the project designer and Caltrans oversight <br />• Monitor the demolition closely to avoid potential damage to the existing facilities <br />j • Review and inspect the temporary support system <br />i coordination with orange Involve the County Inspector early in the game m <br />County Flood Control proactive and effective communication <br />I • Acquire approval of the work plan by the County <br />1 Request the County Inspector attend the construction meeting <br />11"Itt City of Santa Ana I Public Works Agency Page [7 <br />First Street Bridge Replacement I Construction Management
The URL can be used to link to this page
Your browser does not support the video tag.