My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - CUP - 601 S SANTA FE ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
07/18/2011
>
31A - CUP - 601 S SANTA FE ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:42:46 PM
Creation date
7/14/2011 3:41:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31A
Date
7/18/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Branch disbursement should be random so that longer branches and <br />shorter branches are intermingled to give a natural appearance. <br />c. Branches should exceed all antennas by a minimum of 12 inches. <br />d. Branches should start at 15 feet above the ground. <br />e. There should be a minimum space of seven feet between the top of the <br />antenna and the top of the branches. <br />f. Branches should have an upward sweep similar to that of actual Canary <br />Island Pines. <br />g. Branch foliage color should be an olive green with some brown "needles" to <br />match an actual Canary Island Pine. A sample should be submitted for <br />approval prior to fabrication. <br />h. Full bark cladding with a custom color should be submitted for approval prior <br />to fabrication. <br />i. All antennas shall be covered with "pine antenna socks" that match the <br />approved foliage color. <br />j. All "stand-off mounts" and support pipe mounts shall be concealed behind <br />antennas and painted a darker shade or green (or black) with a "flat" paint <br />finish to reduce reflection and visibility of the mounting. <br />k. Include the tree specifications (selected manufacturers and models) with <br />photo simulations (also a site plan review requirement). <br />1. Show the location of the GPS antenna on all elevations. <br />m. Provide a "unistrut" detail for the utility cabinet; an "H-frame" is not <br />acceptable. <br />n. Provide a note on the plans stating "install underground utilities sleeving for <br />two carriers during construction of the structure". Shrouds on the outside of <br />the pole are not acceptable. <br />o. All exterior conduit and electrical meters shall be installed and screened in <br />one metal enclosure painted to match the structure. <br />6. At all times, the permit applicant shall not prevent the City of Santa Ana from <br />having adequate spectrum capacity on the City's 800 MHz radio frequency. <br />Exhibit A <br />Page 2 of 3 <br />Resolution No. 2011-12 <br />Page 5 of 6 <br />31 A-18
The URL can be used to link to this page
Your browser does not support the video tag.