My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-08-24
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
08/24/2011
>
FULL PACKET_2011-08-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:55:11 PM
Creation date
8/18/2011 1:45:21 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Recycling <br />All waste (including construction and demolition materials) resulting from work <br />performed under this contract shall be recycled. The Contractor will be responsible for <br />the disposal of all nonrecyclable waste in accordance with all applicable local, State and <br />federal laws and regulations. A recycling and disposal plan must be submitted for <br />approval prior to start of work. <br />8. General Maintenance and Clean -Up <br />All trash and debris shall be removed from all worksites at the end of each day. The <br />Contractor shall keep sidewalks and all paved areas in parkway swept and cleaned of any <br />debris, dirt, or soil. <br />9. Emergency Service <br />The Contractor shall be able to receive and respond to the City's call for emergency <br />service twenty -four (24) hours per day, seven (7) days per week. Response time shall be <br />immediate but not more than two (2) hours to remove or eliminate a public safety hazard. <br />Contractor shall provide the City with a local telephone number where Contractor can be <br />contacted twenty -four (24) hours per day, seven (7) days per week. <br />PART III. SPECIAL PROVISIONS <br />Contractor shall remove and dispose of the existing street light luminaries attached to the 253 <br />street light poles marked on Exhibit A, attached hereto. Then Contractor shall replace those <br />luminaries with 253 Leotek modet #GCl- 80E- MV- NW -3 -GY -350 LED street light luminaries. <br />Said replacement luminaries shall be provided at Contractor's expense. <br />12 <br />25F -19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.