My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-08-24
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
08/24/2011
>
FULL PACKET_2011-08-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:55:11 PM
Creation date
8/18/2011 1:45:21 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On -Bill Financing Program - Loan Terms Calculations 1 <br />PREPARED FOR: <br />Gary L. Levingston <br />Offer Manager, Financial Solutions Element <br />Customer Energy Efficiency & Solar Division <br />Southern California Edison, an Edison international Company <br />Completion Daterrime: 2116/11 4:20 PM <br />Universal Project Number: <br />Customer Number: <br />Service Account Number: <br />OBF Application Receipt Date: <br />PSAP -10- 004891 <br />1- 000 - 0071 -30 <br />3 -001- 3272 -87 <br />11/1/2010 <br />Project Type(s) : <br />Customized <br />Market Segment: <br />Govt & Inst <br />Business Name: <br />CITY OF SANTA ANA <br />Reference Name: <br />S. CHESTNUT / MAIN LED <br />Address: <br />110 112 E CHESTNUT AVE <br />City, CA Zip: <br />SANTA ANA, CA 92701 <br />— ESTIMATED LOAN TERMS" ' <br />I ACTUAL TERMS WILL BE CALCULATED BASED ON FINAL I <br />REVIEW AND VERIFICATION OF THE PROJECT INSTALLATION <br />REPORT <br />LTC1 completed as of 2116/11 due to recently collected and approved <br />tariff rate, therefore, this loan app will be not be Wait - Listed as per <br />program management. <br />PROJECT ECONOMIC SUMMARY <br />F x ; , u� aka F, PI&1A ADONF " g <br />Previous loans reserved <br />$ <br />Total electricity charges divided by the amount of electricity purchased <br />Y <br />during previous 12 months <br />A.) AVERAGE ELECTRIC BILLING RATE -- past 12 months (Cents /kWh) <br />$0.0820 <br />CIA =60 G &1 =120 <br />B.) ENERGY EFFICIENCY PROJECT SAVINGS <br />Is D.3 within limit YIN? <br />B.1. Estimated Annual Kilowatt Hour Savings (kWh) <br />21,638.00 <br />For Customize from OBF Application, calculated by Customer <br />EUL of measure with greatest kWh contribution <br />For Express Pending, SCE calculations based on Meas solution code <br />B.2. Estimated Annual Dollar($) Savings (B.1 x A) $ <br />jAnn KWh savings x ave rate = $ savings <br />B.3. Estimated Monthly Dollar($) Savings (B.2 / 12) $ <br />147.86 <br />1 Monthly savings <br />C.) COSTS <br />C.1. Estimated Total Project Cost 19,110.00 From OBF Application <br />C.2. Estimated Total Rebate /Incentive 1,081.90 From OBF Application <br />C.3. Estimated Potential Loan Amount (Net Amount) $ 18,028.10 Maximum eligible loan amount <br />D.) <br />D.2. Monthly Loan Repayment Amount <br />D.3. Estimated loan term (Months) <br />0.4. Estimated loan tern (Years) <br />E.) LOAN LIMIT TESTS <br />E.I. Market Segment Amount of Loan Test (Maximum Loan Amount per Service Account) <br />C.3 <br />Time required to repay loan - months <br />Time required to repay loan - years <br />E.1.1 Market Segment Minimum /Maximum Loan Amount $ 1,000,000.00 Min /Max loan amount per service account <br />E.1.2.Within Market Segment Limit? <br />E.2. Customer Loan Limit Test (Previous Loans for this Customer) <br />E.2.1. Customer Loan Amount Limit <br />E.2.2. Previous Loans Reserved for this Customer <br />E.2.3. Estimated Amount Eligible for Loans <br />E.2.4. Within Available Amount? <br />E.3. Market Sediment Length of Loan Test <br />E.3.1.Market Segment Loan Length Limit <br />E.3.2. Within Market Segment Loan Length Limit? <br />EA. Expected Useful Life (EUL)' Loan Length Limit Test <br />E.4.1. Applicable Measure EUL <br />E.4.2. Within EUL Loan Length Limit? <br />E.S. EXCEPTION ANALYSIS (If Test 1 and/or Test 2 yields a "No'.) <br />E.5.1. Monthly Loan Repayment Amount <br />E.5.2. Net Amount for Financing <br />E.S.3. Max Allowable Loan Terms (Months) <br />E.5.4. Max Allowable Loan Terms (Years) <br />Y Is D.1 within loan amount limits YIN? <br />'Expected Useful Life (EUL). Each measure is expected to perform satisfactorily for a period of time. An EUL for each energy efficiency measure is assigned <br />by the California Energy Commission (CEC). The EUL for the measure involved in the energy efficiency project. <br />Agreements to Provide, Install and Fund Exhibit 13 <br />LED Street Lights 25F -36 <br />Max total loans amount per customer <br />Previous loans reserved <br />$ <br />Remaining loan funds available <br />Y <br />Is D.1. < E.2.3. YIN? <br />120 <br />CIA =60 G &1 =120 <br />N <br />Is D.3 within limit YIN? <br />EUL of measure with greatest kWh contribution <br />144 <br />Y <br />Is D.3 within limit Y /N? <br />$ <br />147.86 <br />$ <br />17,743.16 <br />120 <br />10 <br />'Expected Useful Life (EUL). Each measure is expected to perform satisfactorily for a period of time. An EUL for each energy efficiency measure is assigned <br />by the California Energy Commission (CEC). The EUL for the measure involved in the energy efficiency project. <br />Agreements to Provide, Install and Fund Exhibit 13 <br />LED Street Lights 25F -36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.