My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011- 09-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
09/06/2011
>
FULL PACKET_2011- 09-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:47:30 PM
Creation date
9/12/2011 9:21:32 AM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />FEE SCHEDULE <br />ENERGY AND SUSTAINABILITY CONSULTING RATES <br />CONSULTANT HOURLY <br />RATES * <br />Principal in Charge $155.00 <br />Analyst $ 60.00 <br />II. TASKS — PHASE I <br />Task 2A: Oversee preparation and implementation of a Municipal Operations and Community - <br />wide baseline Green House Gas Inventory to be developed by a separately contracted technical <br />consultant. Deliverables will include: <br />• Report on Status of contractor to perform the task. <br />• Coordinate assessment and planning report for conducting the baseline Green House Gas <br />Inventory including the energy savings analysis for the baseline GHG Inventory. <br />• Coordinate and disseminate draft report on the results of the GHG Inventory including <br />the energy savings analysis of the baseline GHG. <br />• Coordinate and disseminate final report on the results of the GHG Inventory including <br />the energy savings analysis of the baseline GHG. <br />• Report on dissemination of the baseline GHG Inventory including the energy savings <br />analysis of the baseline GHG. <br />• File monthly status reports as required by City, SCE and /or CPUC. <br />Task 2B: Oversee preparation and development of Citywide Climate Action Plan to be <br />developed by a separately contracted technical consultant. Deliverables will include: <br />• Coordinate and oversee Assessment and Planning Report for the development of a <br />Citywide Climate Action Plan. <br />• Coordinate and oversee draft Climate Action Plan pursuant to Council timeframe and <br />direction between September 2011 and November 2012. <br />• Coordinate, oversee and report on stakeholder input pursuant to Council timeframe and <br />direction between September 2011 and November 2012. <br />• Coordinate and oversee Final Climate Action Plan pursuant to Council timeframe and <br />direction between September 2011 and November 2012. <br />• Coordinate and oversee monitoring framework for Climate Action Plan. <br />• File monthly status reports from September 2011 through November, 2012 as required by <br />City, SCE and /or CPUC. <br />Task 3: Coordinate California Green Building Code and LEED Certification Training. <br />Deliverables will include: <br />• Coordinate assessment and planning report on California Green Building Code and <br />LEED Certification Training. <br />• Develop quarterly training schedule. <br />• Coordinate, oversee and report on stakeholder input. <br />• Report on best practices and lessons learned <br />12 <br />25E -14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.