My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MACADEE ELECTRICAL CONSTRUCTION
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
M-N (INACTIVE)
>
MACADEE ELECTRICAL CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 12:54:26 PM
Creation date
9/26/2011 9:56:25 AM
Metadata
Fields
Template:
Contracts
Company Name
MACADEE ELECTRICAL CONSTRUCTION
Contract #
A-2011-200
Agency
COMMUNITY DEVELOPMENT
Council Approval Date
8/24/2011
Expiration Date
6/30/2012
Insurance Exp Date
2/1/2012
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />PART 1— SCOPE OF WORK <br />This Request for Proposal calls for the removal and replacement of the existing street light cable in the <br />Oakmont Avenue and Fairmont Avenue Neighborhoods. This project will require replacing all the cable <br />in the entire system with new #8 THW wire. The thirteen existing poles will be required to be rewired <br />with new #12 THW wire, the existing fixtures removed and salvaged, replaced with new metal halide <br />fixtures and lamps. The new fixtures may need minor modifications to fit existing pole configurations. <br />Costs for modification shall be included in proposal amount. A new energized service pedestal has been <br />installed. Proposer shall locate and intercept existing conduit adjacent to service pedestal and install <br />conduits to pull box adjacent to pedestal. All costs for conduit work, including hardscape replacement, to <br />connect to service pedestal shall be included in lump sum costs. New wire shall be placed into and <br />connected properly in service pedestal. All work, equipment, labor and materials necessary to provide <br />complete functioning system shall be included in the Proposal pricing. Existing globes shall be protected <br />and reused. <br />The neighborhood street light system was installed in the early 1920's and is obsolete. The exact <br />condition and location of the underground conduit is unknown although the existing cable was installed <br />10 years ago. The City expects the existing cable to be used to pull the new wire in. Pre -lubrication of the <br />conduits may be necessary. The City does not anticipate that much of the existing conduit will need to be <br />repaired. All costs for conduit repair excluding materials will be included in the costs proposed for hourly <br />work. <br />The Oakmont Avenue and Fairmont Avenue Neighborhoods have approximately 3500 linear feet of <br />cable: <br />Scope of work includes the following: <br />• Remove existing cable from conduit. <br />• Intercept existing conduit and install new conduit to connect to new service point as shown <br />on plan. <br />• Re -wire system using existing conduit. <br />• Replace any deteriorated conduit only if it is impossible to pull the new wire through. <br />• Remove and salvage existing fixtures. <br />• Rewire poles and install new fuses, fixtures, lamps etc. per City Standard #1126-F. <br />Material List: <br />• Fixtures: ULT. M70 MLTLC3M500K 70W multi -tap ballast w/starter (26 + 2 spare) <br />• Wire: #8 THW red, black, green / #12 THW red, black, green <br />• Lamps: Philips CDM 70/C/J/M MH LAMP (26 + 2 spare) <br />• Conduit: 2" Schedule 80 PVC <br />• Fuses: 240V l0A with holder per City Standard #1126-F (2 per pole + 2 spare) <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.