My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NATIONAL DATA & SURVEYING SERVICES 2 - 2011
Clerk
>
Contracts / Agreements
>
N
>
NATIONAL DATA & SURVEYING SERVICES 2 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2014 5:10:54 PM
Creation date
10/5/2011 12:06:41 PM
Metadata
Fields
Template:
Contracts
Company Name
NATIONAL DATA & SURVEYING SERVICES
Contract #
N-2011-119
Agency
PUBLIC WORKS
Expiration Date
6/30/2012
Insurance Exp Date
9/17/2013
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N� S <br />National Data 8c Surveying Services <br />Understanding the Problem <br />General Requirements: <br />Corporate Office <br />8370 Wilshire Blvd. Ste 209 <br />Beverly Hills, CA 90211 <br />T- (323) 782 -0090 <br />F- (323) 375 -1666 <br />Email: lnfofn ndsdata.com <br />NDS proposes to provide the City of Santa Ana with; "24 -hour single /dual -tube Machine Counts" both on- <br />call and citywide, "Manual Turning Movement and Pedestrian Counts ", "Speed Studies ", "Classification <br />Counts ", a "Traffic Census Booklet ", and a "Traffic Flow Map" as required ih RFP. NDS has ample <br />personnel and equipment to complete your anticipated requirements. <br />We understand the requirements of the proposed effort, value the importance of collecting accurate traffic, <br />and possess the knowledge for evaluating the reasonableness of the data and final reports. <br />24 -hour Average Daily Traffic IADTI Counts fSinsrle -tube Dual -tube and Citvwidel: <br />The approximate 280 dual -tube citywide locations can be completed within the two -month period <br />required. NDS has the capability to easily complete 25 simultaneous dug! -tube locations. All additional <br />24 -hour dual /single -tube counts can easily be accomplished at any time. Data collection will be <br />conducted in accordance with the RFP. Reports will be submitted in the specified formats via email as <br />well as on diskette, if requested. <br />Manual Turninsi Movement and Pedestrian Counts: <br />NDS has sufficient personnel to complete the required 15 simultaneous Manual Turning Movement / <br />Pedestrian counts. Data collection will be conducted in accordance with the RFP. Reports will be <br />submitted in the specified formats as well as on diskette, if requested. NDS can use either field <br />personnel of video data collection for the turning movement counts. We will use which ever method the <br />city prefers. <br />Speed Surveys_ <br />NDS has sufficient personnel and equipment to complete 20 simultaneous 24 hour Speed Surveys. <br />Data collection will be conducted in accordance with the RFP SOW. Reports will be submitted in the <br />specified formats as well as on diskette, if requested. <br />Vehicle Classification: <br />NDS has sufficient personnel and equipment to complete 40 simultaneous 24 hour Vehicle Classification <br />Studies. Data collection will be conducted in accordance with the RFP. Reports will be submitted in the <br />specified formats as well as on diskette, if requested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.