My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRANSPORTATION STUDIES, INC. 5 - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
PENDING TERMINATION SLIP
>
TRANSPORTATION STUDIES, INC. 5 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2014 12:56:53 PM
Creation date
10/18/2011 1:05:37 PM
Metadata
Fields
Template:
Contracts
Company Name
TRANSPORTATION STUDIES, INC.
Contract #
N-2011-127
Agency
PUBLIC WORKS
Expiration Date
6/30/2012
Insurance Exp Date
10/1/2014
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TS/ Transportation Studies, /nc_ A Traffic Oata Co! /action Company <br />WORK PLAN <br />24 Hour ADT Counts, Speed Counts � Vehicle Classfffcatfon Counts <br />All counts will be conducted on a Tuesday, Wednesday or Thursday unless instructed <br />otherwise by City's project manager. Counts will not be performed during a holiday <br />week unless instructed to by City's project manager. Counts will not be performed <br />during inclement weather or construction unless instructed to by City's project manager <br />Upon getting a count request by the city TSI will enter locations into computer and print <br />out a log sheet for Seld tech. Prior to setting any location a drive by will be made to <br />check for any adverse road conditions. If problems are noted city will be contacted for <br />instruction. All machines are set one day prior to count so a true 24 hour count can be <br />gotten (mid -night to mid -night ). TSI uses Lo- Profile Tubes on residential streets to <br />reduce noise, EPDM formula tubes on major streets for their durability and Half -Round <br />tubes for speed and classification counts these tubes will lay flat for a more accurate <br />count. (no rolling like round tubes )_ <br />When counts are complete machines are brought into ofTicg for processing. All counts <br />will be in 15 incremerns and hourly cub- total. Counts will then be evaluated before being <br />emailed to City_ ,. <br />Manual Turning Movement and Pedestrian Counts: <br />All counts will be conducted on a Tuesday, Wednesday or Thursday unless instructed <br />otherwise by City's project manager. Courns will not be performed during a holiday <br />week unless instructed to by City's project manager. Counts will not be performed <br />during inclement weather or construction unless Instructed to by City's project manager. <br />Upon getting a count request by the city TSI will enter locations into computer and print <br />out log sheet for each count for count personnel. Each location will then be driven to <br />determine number of people needed to perform count. <br />Upon completion of count, count boards will be down loaded into computer and count <br />printed out and evaluated. All counts will be in 15 minute increments and hourly totals. <br />After evaluation counts "will be emailed to City. <br />2640 Wa /nut,Avenue, Suite H • 7lustin, CA 92780 - (774) 508 -3672 •Fax (774) 508 -3602 <br />
The URL can be used to link to this page
Your browser does not support the video tag.