My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-10-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
11/07/2011
>
FULL PACKET_2011-10-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:29:40 PM
Creation date
11/3/2011 3:52:09 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF QUALIFICATIONS <br />CITY OF SANTA ANA <br />ON -CALL SURVEYING SERVICES <br />ITEM B. MONUMENT PRESERVATION ! WORK PLAN <br />1. After receiving a request for a specific project from the City, Huitt- Zollars will meet with the appropriate <br />City staff to discuss the detailed project scope and timing. <br />2. Based on our understanding, we will prepare a detailed scope of work and provide the City with a cost <br />estimate and schedule to complete the work. <br />3. Research existing City records for current survey and centerline tie information in the project area. <br />4. Research County of Orange Surveyor's Office database for subdivision mapping, Records of Survey <br />and Corner Records in the project area. <br />5. Prepare a preliminary "Search" exhibit for the field crew to use In locating existing monuments that may <br />be disturbed or destroyed during construction. This work includes centerline monuments as well as <br />monuments along the right -of -way lines that may mark property lines of adjacent properties. <br />6. Perform a field survey of the area to identify and locate any existing monumentation in the project area <br />that will be impacted by the construction. <br />7. Set temporary construction ties that are "outside of the area of influence" of the construction project to <br />be used to re -set the points that could be destroyed. <br />8. Prepare a Pre - Construction Corner Record showing the found monuments and the construction ties and <br />process it with the Orange County Surveyor's office. These Corner Records can be utilized by <br />surveyors in the interim until the project is completed and the monuments are re -set. <br />9. If requested by the City after the completion of construction, Huitt- Zollars will utilize the construction ties <br />shown on the Pre - Construction Corner Record to set permanent tagged monuments at the locations of <br />the monuments that were destroyed and if necessary, set new tagged centerline tie points. Ideally, <br />each centerline intersection would be monumented with 4 centerline ties set to help perpetuate the <br />location in the future. <br />10. Prepare a Post - Construction Corner Record showing the newly set monuments and tie points and <br />process it with the Orange County Surveyor's Office. <br />11. Prepare new centerline tie sheets per the City's format to reflect the current conditions of the monument <br />and its ties. <br />12. All work to be performed in Microstation Version 8 (or earlier) and a digital copy to be provided to the <br />City. <br />The staff types that could possibly work on this type of project would be: 2- person survey crew, 3- person survey <br />crew, Survey Manager, Sr. Project Surveyor, Project Surveyor, Survey Tech and Sr. Project Support. <br />WPALGl11- 0219TEXT/8 -18 -11 <br />25F -29 <br />i- 11.1111 } ( ;11_ l AIR ), <br />
The URL can be used to link to this page
Your browser does not support the video tag.