Laserfiche WebLink
EXHIBIT A <br />CITY OF SANTA ANA PUBLIC WORKS AGENCY <br />REQUEST FOR PROPOSAL FOR <br />WEED AND DEBRIS REMOVAL (RFP) <br />I. SCOPE OF WORK/SERVICES <br />1.01 GENERAL CONDITIONS <br />1 . The work to be done shall consist of destroying weeds, wild grass, and poisonous <br />or noxious plants and removing rubbish (including but not limited to scrap metals, <br />junk, disassembled parts of automobiles or machinery, tires, concrete, asphalt, <br />bricks or other construction or demolition materials, debris, litter, cardboard, <br />metal cans, glass, cut brush, dead trees, tree limbs and similar materials), <br />garbage, (including but not limited to animal matter including feces, fruit or <br />vegetable matter) and trimming trees and bushes from properties designated by <br />the Inspector of the Public Works Agency. Hazardous waste or hazardous <br />materials shall not be removed from any property. <br />2. All work, which is determined by the Inspector to be defective or deficient in any <br />of the requirements of the specifications, shall be remedied by the Contractor at <br />his expense in a manner acceptable to the Inspector. <br />3. The Contractor shall maintain all equipment required for the provision of services, <br />as set forth in Sec. 1.03, below, for the duration of this Agreement. <br />4. Contractor shall complete work within the time period set forth as follows: <br />Contractor shall have the ability to clean properties at the rate of no less than <br />18,000 square feet per day excluding discing and any unforeseen <br />circumstances that may cause work to be delayed provided that this amount of <br />work is available. Contractor shall also have the ability to disc properties at the <br />rate of no less than 42,000 square feet per day excluding any mowing, <br />handwork or haul away. <br />5_ Work shall be completed in the same order in which issued by the Inspector; i.e. <br />no invoice will be paid for any of the cleaning of any property until all previous <br />properties have been completely cleaned. All invoices shall be submitted within <br />fourteen (14) days of completion of work. <br />6. If City and Contractor cannot agree as to the method of abatement to be used in <br />a parcel of property, the City reserves the right to retain another contractor to do <br />the necessary abatement work on that parcel. Whenever a dispute between <br />contractor and Inspector shall arise, the word of the Inspector shall prevail. <br />7_ Contractor shall be available, or his/her designate at all times for the duration of <br />the contract.