My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GREENLAND CONSTRUCTION, INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
GREENLAND CONSTRUCTION, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:02:25 PM
Creation date
12/2/2011 9:09:45 AM
Metadata
Fields
Template:
Contracts
Company Name
Greenland Construction Inc.
Contract #
09-6035
Agency
Public Works
Council Approval Date
11/28/2011
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- _ CITY OF SANTA ANA <br />-_ x,. PUBLIC WORKS AGENCY <br />� � � � CONTRACT CHANGE ORDER <br />Project Number 09035; SEVENTEENTH STREET TRIANGLE Change Order Number 1 <br />To Greenland Construction, Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC �/�/ORKS AGENCY <br />EXTRA WORK AT AGREED PRICE <br />1 . Infill steps with concrete per PCO #1 issued on February 7, 2012. <br />AGREED COST = $ 365.38 <br />2. Install retaining curb per PCO #2 issued on February 7, 2012. <br />AGREED COST = $ 7,888.58 <br />3. Re -grade to avoid excess water runoff from entering into adjacent property per PCO #4 issued <br />on February 7, 2012. <br />AGREED COST = $ 704.82 <br />4. Reimburse contractor for County of Orange Flood Control District Right -of -Way encroachment <br />permit per PCO #5 issued on February 7, 2012. <br />AGREED COST = $ 7,024 <br />5. Install Proposition 50 bond information sign per PCO #6 issued on February 7, 2012. <br />AGREED COST = $ 908.61 <br />6. Modify irrigation system to include a new remote control valve and all appurtenances as directed <br />per PCO #7 issued on February 7, 2012. <br />AGREED COST = $ 2,1 19.24 <br />7. Install 1 -inch by 1 -inch vinyl chain link mesh as directed per PCO #13 issued on April 10, 2012. <br />AGREED COST = $ 6,332.70 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.