Laserfiche WebLink
<br /> <br /> <br /> <br /> AGREEMENT C-1-3023 <br /> PROJECT P -WARNER AVENUE -WORK BY LOCATION <br /> ATTACHMENT A <br /> <br /> Comments, Wishes, Needs of Santa Ana <br /> Instructions: Enter any special circumstance such as conduit, communications, central or <br /> field master modifications, new systems, TMC, YIDS, etc. that are not part of the intersection <br /> listing on the Main Data Sheet. Prioritize with 1 being best and 5 being worst. Add items if <br /> you wish. <br /> Priority Description Comments <br /> <br /> 1 es, ee-TP on Warner/Wright Street <br /> <br /> 2 ee-TP on Wamer/Pullman <br /> <br /> 3 Install conduit and interconnect/fiber from traffic <br /> signal cabinet to splice kit (Warner @ Standard) <br /> Install conduit and interconnect/fiber from Grand to <br /> 4 Wright and install communication equipment for IP <br /> communication <br /> 5 Replace existing cabinet with new Type 332 Traffic <br /> Signal Cabinet at Main. <br /> 6 Replace existing cabinet with new Type 332 Traffic <br /> Signal Cabinet at Flower. <br /> <br /> 7 Install conduit and interconnect.fiber from Raitt to <br /> Bristol <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 25B-50 <br />