Laserfiche WebLink
<br /> <br /> <br /> <br /> AGREEMENT C-1-3023 <br /> PROJECT P - WARNER AVENUE - WORK BY LOCATION <br /> ATTACHMENT A <br /> <br /> Comments, Wishes, Needs of Huntington Beach <br /> <br /> <br /> rintersection ions: Enter any special circumstance such as conduit, communications, central or <br /> ster modifications, new systems, TMC, YIDS, etc. that are not part of the <br /> listing on the Main Data Sheet. Prioritize with 1 being best and 5 being worst. <br /> ms if you wish. <br /> Description Comments <br /> Replace existing TWP interconnect (in existing 1.5" <br /> 1 conduits) with new 96-strand SMFO from <br /> Algonquin to Newland along Warner Ave: 21,200 <br /> feet (not accounting for slack in pull boxes) <br /> 2 Upgrade existing pull boxes for new fiber to #6E at estimating approximately <br /> the cabinet and #6 in between signals every-600 feet <br /> Communication equipment at each signal along the <br /> 3 fiber path (13 total): <br /> 1) Fiber Patch Panel; 2) Ethernet Switch; 3) Splice <br /> Enclosure <br /> 4 Interconnect with City of Fountain Valley at <br /> Warner/Magnolia <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 25B-52 <br />