Laserfiche WebLink
<br /> <br /> <br /> <br /> AGREEMENT C-1-3024 <br /> PROJECT P - TUSTIN AVENUE / ROSE DRIVE - WORK BY LOCATION <br /> ATTACHMENT A <br /> <br /> Comments, Wishes, Needs of Santa Ana <br /> Instructions: Enter any special circumstance such as conduit, communications, central or field master <br /> modifications, new systems, TMC, VIDS, etc. that are not part of the intersection listing on the Main Data <br /> Sheet. Prioritize with 1 being best and 5 being worst. Add items if you wish. <br /> <br /> Priority Description Comments <br /> 1 Replace exisitng camera with new Cohu i-dome <br /> camera with video encoder <br /> 2 Replace existing camera with new Cohu i-dome <br /> camera <br /> 3 Install Bluetooth travel time measuring system <br /> 4 Replace existing cabinet with new Type 332 Traffic <br /> Signal Cabinet <br /> 5 Replace existing Video Detection with new Iteris IP <br /> Video Equipment <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 25B-79 <br />