Laserfiche WebLink
<br /> <br /> <br /> <br /> AGREEMENT C-1-3024 <br /> PROJECT P - TUSTIN AVENUE ! ROSE DRIVE - WORK BY LOCATION <br /> ATTACHMENT A <br /> <br /> Comments, Wishes, Needs of Tustin <br /> <br /> Instructions: Enter any special circumstance such as conduit, communications, central or field master <br /> modifications, new systems, TMC, VI DS, etc. that are not part of the intersection listing on the Main Data <br /> Sheet. Prioritize with 1 being best and 5 being worst. Add items if you wish. <br /> Priority Description Comments <br /> <br /> Traffic signal on Tustin Ave./First St. Will require The original cost of $20,000 was based on <br /> 1 additional $8,000 because this is a field master the cost of replacing a local controller and <br /> cabinet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> I <br /> <br /> i <br /> <br /> <br /> 25B-82 <br />