My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-12-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
12/19/2011
>
FULL PACKET_2011-12-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:36:06 PM
Creation date
12/16/2011 3:59:16 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> AGREEMENT C-1-3022 <br /> MacArthur Boulevard/Talbert Avenue <br /> <br /> ATTACHMENT A <br /> Project P Corridor <br /> <br /> Scope of Work <br /> MacArthur Boulevard/Talbert Avenue <br /> INTRODUCTION <br /> The Renewed Measure M (M2), Project P - Regional Traffic Signal Synchronization Program <br /> <br /> (RTSSP) is a mufti-agency, corridor-based approach. that optimizes traffic signal timing based <br /> on analysis of metrics obtained from existing traffic patterns. This approach acknowledges local <br /> agency responsibility and control of signal timing and coordinates with project agencies to <br /> develop acceptable synchronization timing. The PARTICPATING AGENCIES/AGENCY <br /> <br /> (AGENCIES) along the MacArthur Boulevard]Talbert Avenue corridor (PROJECT) have <br /> requested, as detailed in the approved application, that the Orange County Transportation <br /> Authority (AUTHORITY) be designated as the LEAD AGENCY. AUTHORITY will administer the <br /> work with the assistance of consulting or contractor services to provide project management, <br /> <br /> traffic signal timing optimization, and implementation of approved equipment upgrades as <br /> submitted in the application for PROJECT. This scope requires the active assistance by all <br /> corridor AGENCIES throughout the process even without special reference to their participation. <br /> <br /> <br /> PROJECT TRAFFIC SIGNAL SYNCHRONIZATION - PRIMARY IMPLEMENTATION <br /> The following is an outline of the scope of services for PROJECT Primary Implementation that is <br /> associated with developing and implementing optimal PROJECT time-of day traffic signal <br /> coordination plans: <br /> <br /> 1) Project Administration <br /> AUTHORITY shall provide general project administration, environmental processing, and <br /> quality control. PARTICIPATING AGENCIES shall provide support project management <br /> services for the project intersections located within their jurisdiction and assist in maintaining <br /> <br /> PROJECT schedule. <br /> a) Data Collection <br /> The AUTHORITY will assemble with the assistance of PARTICIPATING <br /> AGENCIES the necessary data to understand the existing traffic conditions for <br /> <br /> the PROJECT and its respective traffic signal operations. This shall include, at <br /> minimum, the following: <br /> • All data, documents, plans, photos, etc. related to each Project intersection <br /> within the past two years <br /> <br /> <br /> <br /> <br /> 25B-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.