My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-12-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
12/19/2011
>
FULL PACKET_2011-12-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:36:06 PM
Creation date
12/16/2011 3:59:16 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> AGREEMENT C-1-3022 <br /> MacArthur Boulevard/Talbert Avenue <br /> <br /> ATTACHMENTA <br /> PARTICIPATING AGENCIES to indentify improvements in metrics from the Before to After <br /> <br /> conditions- The Before and After Study shall constitute the PROJECT Final Report. <br /> <br /> Additionally, this report shall document improvements accomplished and recommend <br /> procedures for continuing maintenance, surveillance, and evaluation of the coordinated <br /> <br /> signal system. <br /> <br /> 4. Engineering Design Review, and Procurement/Construction - Support Infrastructure <br /> Each AGENCY shall provide sufficient staffing to provide Engineering Design Review of <br /> <br /> Consultant provided design documentation. If design documentation is provided by the <br /> AGENCY for PROJECT, the Engineering Design Review requirement shall be satisfied. <br /> Purchase and construction/installation of the requested traffic signal infrastructure and <br /> upgrades, software, licenses, or other components as approved in the application shall be <br /> <br /> by the AUTHORITY in the name of and for the end user AGENCY. The AUTHORITY shall <br /> work with the PARTICIPATING AGENCIES to coordinate design, identification of applicable <br /> standards/specrications, purchasing and/or installation of the required improvements. <br /> Design and other technical support to implement the upgrades shall be subject to the <br /> <br /> designated cost estimate. The budget for these improvements is fixed to the approved <br /> budget and will be subject to revised scope or additional contributions. The highest priority <br /> improvements shall be those that are required to optimize signal timing. The AGENCY shall <br /> waive all fees for permits and inspections and shall provide sufficient professional staffing to <br /> <br /> provide construction support and inspection services to PROJECT. <br /> <br /> PROJECT TRAFFIC SIGNAL SYNCHRONIZATION - ON GOING MAINTENANCE AND <br /> MONITORING <br /> <br /> The following is a summary of the on-going maintenance and monitoring for PROJECT: <br /> I) Continued Signal Timing Support <br /> From the date of completion and acceptance of the signal timing implementation by the <br /> AGENCIES, the AUTHORITY shall provide regularly scheduled monthly signal timing <br /> <br /> support to monitor, observe, fine-tune and optimize the signal timing and phasing <br /> operation, PROJECT wide. The AUTHORITY shall provide a reporting mechanism to <br /> the AGE=NCIES documenting any changes made or recommended including <br /> maintenance issues regarding systems components directly related to the Systems <br /> <br /> <br /> <br /> <br /> 25B-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.