Laserfiche WebLink
Exhibit 3 <br />■ ■ SAN LORENZO SEWER LIFT STATION <br />■F—] ENVIRONMENTAL IMPACT REPORT S.0 EXECUTIVE SUMMARY <br />station facility, new underground sewer infrastructure, and sewer manholes and appurtenances as a <br />replacement for the Segerstrom Lift Station would not occur. <br />5.5.2 MODIFIED CONSTRUCTION CONFIGURATION C.2 ALTERNATIVE <br />As described in EIR Section 3.4, implementation of the proposed Project would result in a significant <br />unavoidable impact at the intersection of South Bristol Street at West Segerstrom Avenue for up to five <br />weeks during construction activities within the intersection and /or when construction activities require access <br />to two (2) northbound lanes within South Bristol Street northerly of the intersection. In order to avoid this <br />significant unavoidable impact, Construction Configuration C.2 would need to be altered to include timing <br />restrictions so as to avoid traffic control measures between the hours of 7:15 a.m. to 8:00 a.m. and between <br />the hours of 2:30 p.m. and 6:45 p.m. According to the Project's engineer, such time restrictions would limit <br />construction activities to about 1 -2 hours per day before construction activities would need to cease in order <br />to ensure that traffic control is removed by 2:30 p.m. Such time restrictions are considered infeasible from a <br />practical perspective because they would dramatically elongate the construction schedule for construction <br />activities within the intersection from up to 150 days (3-2 weeks Monday - Friday) to approximately 6049- <br />12050 days (based on an assumption of one to two working hours per day with traffic control, and <br />approximately 12050 working hours needed to complete construction within the intersection). The time <br />restrictions also would elongate the construction schedule for work within South Bristol Street, which would <br />increase from approximately 10-5 days (2-3 weeks Monday — Friday) to 4060 -804-20 days (based on an <br />assumption of one to two working hours per day with traffic control, and approximately 8047M working <br />hours needed to complete the portion of construction within South Bristol Street requiring access to two <br />northbound travel lanes). With an elongated construction schedule of up to 20045 days (40-_t5 weeks, or <br />nearly 101 months), construction costs would be increased and construction equipment and associated <br />activities would be a nuisance to adjacent land uses for a longer period of time. <br />However, as shown on EIR Figure 3.4 -8, acceptable levels of service at the intersection of South Bristol <br />Street /West Segerstrom Avenue could be maintained between the hours of 6:45 p.m. and 7:00 a.m. without <br />elongating the construction schedule. Assuming that traffic control measures would require approximately <br />four hours (i.e., two hours to set up and two hours for removal), this would allow for approximately 8.25 <br />working hours per day for improvements within the intersection of South Bristol Street/West Segerstrom <br />Avenue. Therefore, this nighttime construction alternative, identified herein as the "Modified Construction <br />Configuration C.2 Alternative," considers modifying the construction schedule for the ..aAia.,s of <br />construction Phases 4- 14 and 16 involving eenstruetientransitioning the existing sewer within Bristol to <br />the new lift station within the inn eetion and viithin South Br -istal Street so as to limit the hours of <br />traffic control and construction activities to between the hours of 6:45 p.m. and 7:00 a.m. (nighttime). <br />Impacts to the intersection of South Bristol Street /West Segerstrom Avenue still would occur under this <br />alternative during Construction Phase 11, as Construction Phase 11 would require implementation of <br />Construction Configuration C.2 for a period of up to three weeks on a 24 -hour basis. Implementation of the <br />Modified Construction Configuration C.2 Alternative would otherwise be identical to the proposed Project. <br />The Modified Construction Configuration C.2 Alternative was selected for consideration in order to avoid <br />reduce by two weeks the duration of the Project's significant and unavoidable short-term traffic impacts to <br />the intersection of South Bristol Street/ West Segerstrom Avenue. <br />S.5.3 ALTERNATIVE SITES <br />This EIR evaluates a total of 19 alternative site locations for the proposed San Lorenzo Lift Station facility. <br />The alternative site locations selected for consideration in this EIR include a reasonable range of potential <br />PAGE S -7 <br />55A -107 <br />