My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
01/17/2012
>
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:08:49 PM
Creation date
1/12/2012 2:59:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
1/17/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 3 <br />■■ SAN LORENZO SEWER LIFT STATION <br />■ F] ENVIRONMENTAL IMPACT REPORT S.O ExEcurw SUMMARY <br />• Alternative Site No. 14 would be located in the parking lot of an existing commercial complex <br />(located at the southeast corner of the intersection of South Bristol Street and West Warner Avenue). <br />• Alternative Site No. 15 would be located in the parking lot of an existing commercial complex <br />(located at the southeast corner of the intersection of South Bristol Street and West Warner Avenue). <br />• Alternative Site No. 16 would be located within Carl Thornton Park (1801 West Segerstrom <br />Avenue). <br />• Alternative Site No. 17 would be located in the parking lot of an existing commercial complex <br />(approximately 3200 South Bristol Street). <br />• Alternative Site No. 18 would be located in the parking lot of an existing commercial center <br />(approximately 3300 South Bristol Street). <br />• Alternative No. 19 would be located in the parking lot of an existing commercial center <br />(approximately 3301 -3365 South Bristol Street). <br />S.6 SUMMARY OF IMPACTS, PROJECT REQUIREMENTS, MITIGATION MEASURES, AND CONCLUSIONS <br />S.6.1 EFFECTS FOUND NOT TO BE SIGNIFICANT <br />The scope of this EIR has been narrowed to six (6) subject areas through the completion of an Initial Study <br />prepared by the City of Santa Ana pursuant to CEQA Guidelines Section 15063 and CEQA Statute Section <br />21002.1(e), as well as consideration of public comment received by the City on this EIR's NOP. The Initial <br />Study, NOP, and public comments received in response to the NOP, are attached to this EIR as Appendix A. <br />Subject areas for which the Initial Study concluded that impacts would be clearly less than significant and <br />that do not warrant further analysis in this EIR include: Aesthetics, Agricultural Resources, Biological <br />Resources, Cultural Resources, Geology and Soils, Land Use and Planning, Mineral Resources, Population <br />and Housing, Public Services, Recreation, and Utilities and Service Systems (except wastewater). The EIR <br />addresses these topics in Section 4.4, Effects Found Not To Be Significant. <br />S.6.2 IMPACTS OF THE PROPOSED PROJECT <br />Table S -1, Mitigation, Monitoring, and Reporting Program, provides a summary of the proposed Project's <br />environmental impacts. Also presented are the Project's design features and the mandatory regulatory <br />requirements that would serve to reduce or avoid impacts, as well as the mitigation measures imposed on the <br />Project by the City of Santa Ana to further avoid adverse environmental impacts or to reduce their level of <br />significance. <br />PAGE S -9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.