My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
01/17/2012
>
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:08:49 PM
Creation date
1/12/2012 2:59:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
1/17/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 3 Findings Regarding Project Alternatives Attachment "A" <br />the proposed Project. In addition, construction noise levels would be greater under this alternative <br />due to the closer proximity of residential land uses; however, construction noise impacts would be <br />regarded as less than significant as with the proposed Project. Impacts related near -term water quality <br />and hydrology would be slightly increased under this alternative (though such impacts would not be <br />significant), while impacts to noise (long - term), utilities and service systems, and water quality and <br />hydrology (long -term) would be similar to the proposed Project. <br />3.4.12.3 Finding and Rationale for Alternative Site No. 10 <br />The City hereby finds that specific economic, legal, social, technological, or other considerations <br />make Alternative Site No. 10 infeasible. <br />Alternative Site No. 10 would result in an overall increase in impacts to transportation/traffic as <br />compared to the proposed Project. Although this alternative would avoid the proposed Project's <br />significant and unavoidable impact to the south Bristol Street/West Segerstrom Avenue during the <br />five weeks in which Construction Configuration C.2 would be in place, this alternative would result <br />in a LOS deficiency that would occur for approximately 33 days during construction, would result in <br />new significant unavoidable impacts due to the disruption of left -turn movements along South Bristol <br />Street, and also would result in a new significant and unavoidable impact to parking (near- and long- <br />term) that would not occur in association with the proposed Project. In light of these considerations, <br />the City finds that Alternative Site No. 10 would result in an overall increase in near -term impacts to <br />transportation /traffic, and rejects this alternative as infeasible because it would not avoid or <br />substantially lessen any significant effects of the Project. (CEQA Guidelines Section 15126.6(b).) <br />This alternative also is rejected as infeasible because it would fail to meet, or would not be as <br />effective in achieving, the proposed Project's objectives. This alternative would not be as effective <br />in achieving the Project's objective to minimize odor - related nuisances to land uses in close <br />proximity. In addition, this alternative would result in inadequate parking at an existing medical <br />office building, and would, therefore, fail to meet the proposed Project's objective of avoiding <br />detrimental effects to existing businesses. Detrimental effects to business would be further <br />exacerbated by ongoing construction in close proximity to the existing medical office building. <br />Further, unlike the proposed Project site where the City has an existing sewer easement, construction <br />at this location would require the City to acquire private property to provide easements for proposed <br />sewer lines. Finally, construction of the lift station at this location would replace currently developed, <br />useable land, in contrast to the proposed Project site, which is vacant and undeveloped. <br />3.4.13 Alternative Site Location No. 11 (Alternative Site No. 11) <br />3.4.13.1 Summary of Alternative Site No. 11 <br />Alternative Site Location Number 11 (Alternative Site No. 11) would involve the construction of a <br />replacement lift station in the parking lot of an existing medical building located at 2650 South <br />Bristol Street in lieu of the proposed Project site. Alternative Site No. 11 is located approximately <br />0.27 -mile north of the proposed Project site. The location of Alternative Site No. 11 is depicted on <br />Final EIR Figure 5 -1. Due to the existing configuration of this site and in order to minimize <br />disruptions to the existing use during construction and long -term operation, it is assumed that a <br />replacement lift station at this location would need to be located along or near the western property <br />line. <br />San Lorenzo Lift Station EIR (Project No. 06 -3510) 3 -24 <br />CEQA Findings of Fact/Statement of Overriding Considerations <br />55A -63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.