Laserfiche WebLink
(b) fall /winter — Stover Seed Company Grand Slam seed at eight <br />pounds per 1,000 square feet <br />This shall be accomplished by mowing the existing turf down to 1/4" <br />followed by verticutting (straight blades) to remove thatch. Prior to <br />seeding, the contractor shall eradicate all weeds and have the irrigation <br />system functioning properly and have a plan to provide supplemental <br />irrigation as necessary to germinate the seed to 100 %. The field shall be <br />top dressed prior to seeding to provide a 100% flat playing surface. <br />The Contractor shall guarantee 100% uniform germination within 10 <br />weeks from the time the first application of seed or will sod any thin or <br />bare areas with Pacific Sod Greg Norman 1 Hybrid Bermuda sod or <br />Pacific Sod Greg Norman 1 Hybrid Bermuda Sod that has been "cropped <br />over" with perennial rye grass. Renovation must be completed within <br />three months of field closure. Director shall determine sod based on <br />availability /season. <br />(2) Overseeding: Once per month the Contractor shall overseed sport fields <br />at a rate of one (1) pound per 1,000 square feet by mowing the existing <br />turf down to 3/4" followed by verticutting (straight blades) to remove <br />thatch. This overseeding occurs on all priority sport turf regardless of <br />whether or not a renovation was completed. <br />2. Ground Cover Care <br />a) Edging and Detailing <br />(1) Ground cover beds shall be maintained within their intended bounds and <br />edged and /or detailed the first week of every month to keep the beds <br />looking manicured at all times. <br />(2) Ground cover shall not encroach into lawns, shrubs, adjacent desirable <br />bare areas, curbs, wall fixtures, furniture, beneath and /or into other <br />plants, etc. All sites shall be cleaned following each edging /detailing, <br />including streets. <br />b) Mulching of Bare Areas <br />In all groundcover areas where bare soil is visible or where the groundcover is <br />thin so the soil is visible, the Contractor shall apply AG Organics, Inc. AG203 <br />Nutri Mulch 2 "- 3" minus or approved equal, %2" thick minimum quarterly <br />(every third week of January, April, July, and October) and as necessary to <br />maintain uniform and complete coverage. Mulch is to be removed and <br />completely replaced with fresh mulch every July. <br />19 <br />25H -29 <br />